Installation of the probe
The probe has to be installed in vertical position, the electrical wire
being on top. Refer to drawing.
Yès
NO
A 15 mm hole has to be drilled on top
of the filtration pipe.
The part N°1 has to be glued on pipe
and the part N°2 has to be glued on
part N°1.
The probe is then threaded in part
N°2.
Refer to drawing.
Содержание Regulmatic
Страница 2: ...FR Notice d installation d utilisation et d entretien...
Страница 7: ...Pro Matic...
Страница 9: ......
Страница 12: ...ESP Instrucciones de instalaci n de uso y de mantenimiento...
Страница 21: ...PT Instru es de instala o de uso e de manuten o...
Страница 30: ...ITA Manuale d Installazione Utilizzazione e di Manutenzione...
Страница 35: ......
Страница 39: ...ENG Owners manual...
Страница 44: ......