background image

APPLICATION NOTE

INFUTEST

Series C & Series D

AN-17.2004: Page 2 of 4

1-800-667-6557

www.datrend.com

© 

 Datrend Systems Inc.

and run that test for one minute.  The test is stopped
and  medTester  requests Infutest to return the
occlusion pressure measured via the GSA4 command.

A  complete  description  of  the Infutest remote control
commands is given in the 

Infutest Operating Manual.

4.  ENTERING CHECKLISTS WITH SENTINEL

To  input  the  Checklists  described  in the previous
section  via  DNI  Nevada's Sentinel program, boot
Sentinel on your PC and press D to select 

"Reference

Databases"

 from the 

"Main Menu"

. Press C to select

"Procedures Maintenance"

, then press A to display the

"Relational  Procedures  Maintenance"

  screen.  Press

the h key to create a new procedure. Type 

INFUTEST

SR1

 in the Procedure Name box, hit e twice, and then

press  u  to  begin  editing  the  new  Checklist you have
just created.

On  the 

PROCEDURE  ITEMS MAINTENANCE

screen,  press  h to view the 

CHECK  ITEM  MASTER

LIST.

  Now  press  hagain  to  display  the 

CHECK  ITEM

RECORD

 input box. This box allows you to enter new

Check  Items  into  Sentinel's Master List. For the
command

\M  RTA1

in  the  checklist  of  the  previous  section,  enter

INFUTEST

  in  the "Type" box, enter 

RTA1

  in  the

"Desc."  box,  and  enter 

M

  in  the  "Control"  box.  Now

press u to save this new Check Item.

NOTE: DO  NOT

  enter  \M  RTA1 in the "Desc." box.

Enter only 

RTA1

. Sentinel  takes care of the \M

via  the  character  you  enter  in  the  "Control"
box.

Press h again to add the 180-second delay command:

\M  180

to the Master List

.

 In the 

CHECK ITEM RECORD

 

box, enter 

DELAY

 in the "Type" box, enter 

180

  in the

"Desc." box, and enter 

M

 in the "Control" box. Press u

to save this timed delay command in Sentinel's Master
List. Do not enter \M  180 in the "Desc." box. Enter only

180

. Sentinel takes care of the \M via the character you

enter in the "Control" box.

Continue with this process, adding the remaining
INFUTEST  and  DELAY  commands  to  Sentinel's
Master List.  Once you have finished entering all the
new Check Items, use the 

wy 

keys to scroll through the

Master  List  and  tag  your  new  Check  Items in the
correct order by pressing the 

k

 bar. Press u to copy

the  tagged  Check  Items  into  your new Checklist
INFUTEST  SR1.  Exit  the 

PROCEDURE ITEMS

MAINTENANCE

  screen by pressing the ^ key

.

  Keep

pressing ^until you are back to Sentinel's 

Main Menu.

After  downloading your Checklists from Sentinel to
medTester  via  Sentinel's 

Communications  Menu

,

press  UTIL  and  PORTS  on  medTester's  keypad  and
set COM1 to OFF and set COM2 to ON.  Now press
the  UTIL,  RS232  and  COM2  keys on the medTester
and check the settings are 9600 baud, 1 stop bit, parity
OFF,  length  8  bits,  and  CTS  OFF. Connect
medTester's COM2 to Infutest using a Datrend SSC-1
cable. You can then execute the Infutest Checklist by
typing

INFUTEST SR1

on the medTester keypad and pressing "ENT". 

5.  medTester "BUGS"

DNI  Nevada's medTester 5000B appears to have a
number  of  software bugs related to interface with
externally connected devices. The type of bugs you
may  experience  with  your  medTester  will  depend on
the  software  version  and  hardware  configuration  of
your instrument. This section lists bugs which we have
discovered  or  which  have  been reported by our
customers to date.

a.

medTester  software 

versions  3.55

 

and  earlier

have  problems  in  retrieving  data  via  COM2.  To
overcome  this  medTester  bug,  precede  Infutest
"Get  Summary"  commands in checklists with a
PASS/FAIL  prompt.  The  following example
illustrates the patch:

\M  RTA1
\M  180
\M  STA
\P  GET DATA FROM INFUTEST
\M  GSA1

The  first  command starts a Single Rate Test on
Infutest  Channel  A.  The  second  command
provides a delay of 180 sec. The next command
stops the Infutest. The \P command which follows
makes medTester ready to receive data via COM2
(note  medTester  will  wait  at  this  point  until you
press PASS or FAIL on the medTester keyboard).
The  last  command  downloads the test summary
from the Infutest.

Содержание medTester 5000B

Страница 1: ...d check items which begin with M followed by an Infutest remote control command A check item beginning with M tells medTester to get data from COM2 instead of from the medTester keyboard In executing a Checklist with M items the medTester will transmit whatever characters follow M to the Infutest via COM2 and then will wait for data to be returned via COM2 Depending on the command which follows th...

Страница 2: ...this process adding the remaining INFUTEST and DELAY commands to Sentinel s Master List Once you have finished entering all the new Check Items use the wy keys to scroll through the Master List and tag your new Check Items in the correct order by pressing the k bar Press u to copy the tagged Check Items into your new Checklist INFUTEST SR1 Exit the PROCEDURE ITEMS MAINTENANCE screen by pressing th...

Страница 3: ...negative medTester s RTS signal will prevent Infutest from downloading data To overcome this problem on the medTester you can modify your Datrend SSC 1 cable by opening the DB 25 shells and cutting the wires connected to pins 4 and 5 Solder a jumper lead so that pin 4 of the SSC 1 is shorted to pin 5 Perform this modification at both ends of the SSC 1 This will override Infutest s RTS CTS signalli...

Страница 4: ... 2 hh mm ss VVVVV ml AAAAA ml h where hh mm ss infusion time VVVVV infused volume AAAAA average infusion rate Download PCA Pump Test Summary Data GSA3 GSB3 VVVVV ml AAAAA ml h mm ss where VVVVV average bolus volume AAAAA avg bolus delivery rate mm ss average lockout time Download Occlusion Pressure Test Summary Data GSA4 GSB4 type PP P psi pppp mmHg at mm ss where type MAX NRS or OVP PP P occlusio...

Отзывы: