CONTENTS OF THE PACKAGING
15
1
1.7 INSTALLATION ENVIRONMENT
The marking system must be installed in a suitable environment in order to allow proper air flow passage and
correct housing of the cables.
Ulyxe PL
TM
is an air cooled marking system, an adequate air flow is necessary to guarantee its correct
cooling. Installation must not slow or stop the flow of air cooling. Moreover, do not install a heat source near.
Figure 6: Installation environment.
To obtain a good marking quality, and not to decrease life time, we recommended a ventilation or vacuum
system in a protection box to limit dust due to marking phase.
1.8 FUME / DUST EXTRACTOR
During marking process, dust and/or gas may be produced. It is important to use adequate fume extractor
and/or air filtration.
WARNING!
Marking PVC (or other plastic material) can cause the release of chlorine gas which can be harmful
to the laser operator and to the marking system itself. Always use adequate fume extractor during
PVC and plastic marking.
Содержание Ulyxe PL
Страница 1: ...USER S MANUAL Ulyxe PLTM ...
Страница 27: ...TECHNICAL SPECIFICATIONS 27 2 EXAMPLE OF CONNECTION TO PLC Figure 18 Example of connection to PLC ...
Страница 56: ...56 LABELS LOCATION Figure 44 External labels location ...
Страница 66: ...66 APPENDIX D MECHANICAL DRAWINGS NOTE Please refer to Datalogic website for detailed drawings ...
Страница 68: ...68 ...