Company Address: Room 601, Floor 6, Building F, Songbai Road 1008, Sunshine Community
,
Xili Street, Nanshan District, Shenzhen(518108)
Factory Address: Fl1, Bldg B, Wentao Industrial zone, Yingrenshiyongxin Village, Shiyan Street, Baoan district, Shenzhen, Guangdong, China (518055)
Tel: +86-755-26014509/4710/4711 Fax:+86-755-26014506
Website: www.cdatatec.com
10
7.
The identification of the label should indicate the name, number, and management IP
address assignment of the equipment according to the design text. the CAT5, power
line and coaxial cable should indicate the direction of the line.
2.4 Installation Method
2.4.1 Installation Preparation
1. Tool preparation
Universal tools:
Marker, knife, special hexagon wrench, adjustable wrench, vise,
screwdriver, diagonal pliers, waterproof tape.
Auxiliary tools:
ladder, rubber hammer, etc.
2. Before preparing for installation, check the installation conditions (location, power
supply, grounding, and lightning protection) of the equipment according to the above
requirements to ensure that the equipment is in a good operating environment for a
long term.
3. Make sure that the EOC master is powered off during the installation process.
4. The installation process is roughly divided into the following steps: unpacking the
device-----installing the buckle-----hanging installation-----opening equipment
flap-----checking the internal cable connection-connecting the cable signal
line-----Power on the device-----End.
Figure
:
Unscrew the hex screw at the bottom of the EOC Master