11
The unit may be too tall to fit through a doorway while on the skid. Measure the unit and doorway
heights and refer to the installation plans to verify clearances prior to moving the unit.
WARNING:
Use care when moving. Improper handling could result in injury.
Proper care should be taken when uncrating the unit. The packaging has wrap
-
ping bands with sharp edges that are under tension, crating has staples and
splinters. Proper protective equipment should be worn by qualified personnel.
2.4 Rigging
Move the unit in its upright position to the installation site. It is recommended that the unit be protected
from damage to the decorative doors during any storage or moving. Removal of the decorative doors
is easily accomplished and may be done without moving the equipment.
The shipping skid should be left in place if the unit is being moved with a forklift. If the unit is being
lifted, use spreader bars to prevent damage to the doors and panels.
The unit has 3/4” (19mm) holes in the shipping skid to which casters with 3/4” (19mm) stems can be
attached. This allows easy movement down halls, into elevators and through doorways. If clearance
is a problem the casters may be inserted directly into the bottom of the 1” (25mm) tubular steel corner
posts at the bottom of the unit.
WARNING:
Improper lifting or moving of the equipment may result in damage
to the decorative doors, panels or frame members.
2.5 Locating the Unit
Verify that the floor is level, solid and sufficient to support the unit. When installing the unit, sufficient
space must be allowed for airflow clearance, wiring, plumbing and service access
. It is recommended
that each side and front have a clearance of at least 36” (914mm) to allow the doors to swing open
and for servicing the unit.
The doors on some sides may not require as much service clearance. Refer to the particular unit
component breakdown drawings for assistance. Rear clearance is not required, but 1” to 2” (25 to
50mm) of clearance is suggested.
For the best air distribution, the unit should be centered against the longest wall, distributing the cold
air as close to heat load as possible, unless the unit is ducted. The unit should not be placed near any
corner of the room or at the end of a long, narrow room. Install the units as close as possible to the
largest heat load. Multiple units should be evenly spaced, as far apart as possible. It is recommended
to install an under-floor water detection system.
NOTE:
Condensation formation and frequent humidifier flushing are normal
functions of this equipment. Proper drain connections must be made to ensure
proper removal. Unit will require water connections for condensate removal
and possibly for humidifier makeup water, chilled water and/or hot water. In
-
stallation of units above equipment that could sustain water damage should be
avoided.