background image

 

11 

 

2) Explanations on 

RS485C communication terminal and connector   

 

 

Communication output terminal (inside the inverter)

:

 

RS485 

Communication 

BUS(+) 

BUS(-) 

Red 

Black 

   

   

 

 

 

 

Communication connector terminal (outside the inverter)

:

 

 

 

 

 

 

 

R485 communication terminal is designed as above.

 

Communication  connector  is  an  optional  item.  Please  inquire  with  our  company  if  you  need 

communication connection.

 

 

3) Setting of 

communication protocol 

 

 

This  product  supports  2  different  communication  protocol  modes,  namely,  Dass  Tech  protocol  and 

integrated new renewable energy convergence support monitoring system (REMS). 

 

The  basic  value  is  set at  integrated  new  renewable  energy  convergence  support monitoring  system 

(REMS) at the time of shipping from the factory. ID is set at 

‘1’ as the basic value. 

 

There is a need to change the communication protocol setting at the time of using Dass Tech protocol. 

 

After having accessed Setting menu - Selection Set 

– REMS Monitor menu, change the set value to 

Disable  and  save  with  Enter  key.  Then,  cut  off  the  input  power  to  and  discharge  inverter  prior  to 

reconnecting the power to convert to Dass Tech protocol. 

 

 

3.4 Wiring 

 

3.4.1 Main circuit wiring 

 
1) Precautions at the time of wiring the main circuit 
 

   For  input  power,  connect  the 

CH1/CH2(+)terminal  of  solar  cell  panel  to  the  internal 

PV1(+)/PV2(+)

 

terminal  inside  the  junction  box

  and 

CH1/CH2(-)terminal  of  solar  cell  panel  to 

the PV1(-)/PV2(-)terminal inside the junction box 

before inputting power. 

Take precaution against loss due to fire arising from erroneous wiring of the junction box. 
   

   Do not disassemble connector during operation. 

 

   In the event of emergency power OFF during operation, turn OFF the DC switch of junction box. 

 

 

Содержание Soleaf DSP-123JB-OD

Страница 1: ...DASSTECH Photovoltaic Grid Connected Inverter Junction Box DSP 123K6 OD ver1 3 DSP 123JB OD ver1 1 Operation and Installation Manual ...

Страница 2: ...1 4 Operation 14 4 1 Explanation on functions of display window 14 4 2 Display mode for basic status 15 4 3 Operating method 17 5 Functions 17 5 1 Explanations on functions 17 6 Explanations on junction box 19 6 1 Basic specifications 19 6 2 Components block diagram and names 19 6 3 Precautions in wiring 20 7 Maintenance 22 7 1 Symptoms of breakdown 22 7 2 Repairing breakdowns 22 8 Quality assuran...

Страница 3: ...anual in order to sufficiently and safely use all the functions of DSP series inverter Warning Do not operate while the front cover is opened It becomes a cause of electrocution due to the exposure of high voltage terminal or charging section Do not manipulate switch with wet hand It becomes a cause of electrocution Do not open the cover while power is turned on or during operation It becomes a ca...

Страница 4: ...pact to the inverter since it is a precision device 2 Application method If the automatic operation functions is set at basic value it operates automatically if the operating voltage is exceeded and stops automatically if the voltage falls below the operating voltage It can be started and stopped with Operation Stop key on the keypad Since the inverter will be reinitiated after prescribed standard...

Страница 5: ...ser Manual for the installation direction Do not drop or impart strong impact onto the inverter since it is a precision device Execute class 3 200V class grounding for inverter Do not use other household appliances in close vicinity of this product Abnormality or noise can be made in the household appliances Make sure to use the rack provided for exclusive use of the product and take precautions a...

Страница 6: ...ect the nameplate on the lateral side of the main body to check the format and rated output of the inverter is the same as those of the product you ordered In addition check for any breakage during delivery 1 Inverter types 2 Components Please contact our company if there are any components missing including User and Installation Manual output AC connector installation rack and components for fixa...

Страница 7: ...ar cell power DC and system power AC by using terminal block and connector If not connected accurately inverter and surrounding devices can suffer breakage As such wire with caution 2 1 7 Photovoltaic system composition Proper contact is needed for the inverter under proper setting of the peripheral devices Erroneous system composition and contact can make normal operation impossible or result in ...

Страница 8: ...Tracking MPPT control Since occurrence of direct current that is not uniform in accordance with the temperature humidity climate environment and insolation given the output characteristics of solar cells inverter controls the solar cell modules to maintain the maximum power point through MPPT control 6 Ease of parallel operation If the capacity of solar cell module increases it is possible to easi...

Страница 9: ...an 50 dB External dimension 358 376 150 mm Total weight 9kg External interface RS485 Monitoring terminal unit Option DSP WR5 DSP ZR5 CM 04A001 wired wireless RS485 Protection functions Inverter Excessive input voltage output short circuit overload inverter overheating protection and prevention of DC output discharge System Single operation protection system over voltage and under voltage protectio...

Страница 10: ... 50 4 Avoid location with high temperature and humidity less than relative humidity of 90 and absence of dew formation 5 Since inverter generates high level of heat make sure to install it on surface with non flammable material 6 Install the inverter by securing sufficient space around it to allow harmonious dispersion of heat 7 Avoid location with oil mist inflammable gas fibrous dust dust and mo...

Страница 11: ...s Terminal names Explanations DC PV input power Connect with the terminal of the output power of solar cell DC PV input power Connect with terminal of output power of solar cell RS485 Communication terminal Connect with the signal line of monitoring system AC System power connection terminal Output from the inverter is connected to the KEPCO system and grounding line Note Refer to 6 Explanations o...

Страница 12: ...et at 1 as the basic value There is a need to change the communication protocol setting at the time of using Dass Tech protocol After having accessed Setting menu Selection Set REMS Monitor menu change the set value to Disable and save with Enter key Then cut off the input power to and discharge inverter prior to reconnecting the power to convert to Dass Tech protocol 3 4 Wiring 3 4 1 Main circuit...

Страница 13: ...t screw as grounding terminal Use dedicated grounding cable Use the grounding point as near to the inverter as possible Use grounding cable with the following thickness by maintaining the length as short as possible Capacity Ground cable thickness mm 1 5 3 5 kW 4 0 5 kW 6 0 Check the maximum input voltage of inverter and output voltage of solar cell array If the output voltage of solar cell array ...

Страница 14: ... installation 3 4 2 Communication circuit wiring 1 Precautions at the time of communication circuit wiring Use communication connector at the time of control circuit terminal wiring Refer to 3 3 Terminal wiring diagram ...

Страница 15: ...status of inverter operation Green light Normal inverter power generation FAULT Indicates inverter breakdown Red light Lights up if inverter breakdown occurs CH 1 CH 2 Indicates breakdown for each channel at the time of disconnection of junction box FUSE Red light Disconnection of junction box FUSE LCD display window for power generated Explanations 100 LED Lights up at the time of 61 100 power ge...

Страница 16: ...Unit 4 2 2 System power input Input display System power frequency System power current Line System 60 0 Hz Output current Status of inverter operation Output voltage 4 2 3 Check total power generated Input display Total power generated Total Total power generated kWh Status of inverter operation Unit 4 2 4 Check power generated on the day Input display Total power generated TODAY Power generated ...

Страница 17: ...ion Unit 4 2 6 Check current power generation Input display Power generated at the moment RUN Status of operation kW Status of inverter operation Unit 4 2 7 Error status Indicated for 5 minutes at the time of error occurrence Input display Name of error Error code S OV Explanations on error DAY 1 10 kWh 3 5kW RUN 3 5kW 97 2 E012 Sol_OV Solar Over Voltage ...

Страница 18: ... the event of abnormality 5 Functions 5 1 Explanations on functions 5 1 1 System monitoring Presence of normal and abnormal system voltage is determined by the difference in the voltage with the normal voltage Fault high vtg Fault low vtg If this value is larger or smaller than the designated value the inverter will be stopped If the frequency of the system voltage Line frequency is outside the ra...

Страница 19: ...e contact our company in such event 5 1 4 Breakdown Fault 1 Breakdown Fault Protection against Input over voltage If the voltage of solar cell is above the stipulated voltage the system will be stopped to protect the inverter Protection against output overcurrent If output overcurrent occurs in the inverter under the abnormal conditions of load state the system will be stopped to protect the inver...

Страница 20: ...e can generate along with risk of death in serious cases due to generation of powerful sparks if fuse is removed forcibly Install the junction box in a location that allows the user to inspection it conveniently Power lamp doesn t light up for the photovoltaic inverter in the event of short circuiting of junction box fuse Under normal state CH1 and CH2 lamps of the inverter section do not operate ...

Страница 21: ...t the time of cable wiring to the terminal block make sure to use compression terminal O or U type There is a possibility of inducing fire due to defective contact if cable is connected directly Fuse will melt and short circuited due to exceeding of allowed current if or cable is used commonly Make sure to wire the cable in accordance with the cable wiring diagram ...

Страница 22: ...use occurs due to overcurrent on the side If is bound together and wired in the connection board on the module side melting and short circuiting of the fuse occurs due to overcurrent on the side Module Channel No 1 Module Channel No 2 Module Channel No 1 Module Channel No 2 Example 1 Erroneous cable wiring diagram ...

Страница 23: ...0Ω Input circuit breaker 12 months Check the status of operation of DC circuit breaker Check On Off state Display window screen 12 months Check discoloration and deformation of display window LCD Visual inspection Control power 12 months Check the status of power of internal SMPS Check voltage Relay MC 12 months Check the status of operation of relay or electronic contact device MC Check On Off st...

Страница 24: ...ssible to remotely check the current status and past history conveniently if the photovoltaic monitoring system is installed 7 3 2 Conditions of exterior Inspect presence of peeling of painting dents and breakage in the external aspects of the inverter Inspect for abnormality in the contact areas where power is applied due to occurrence of corrosion Inspect the state of fixation of inverter by che...

Страница 25: ...erter to control the state of output At the time of stoppage operation of inverter inspect whether the relay MC operation sound clicking sound occurs and whether error has occurred In the event of occurrence of abnormality in relay MC errors such as Relay Short Open MC Error etc will occur and stops the operation of inverter 7 3 11 Capacitor Capacitor for controlling of power inside the inverter h...

Страница 26: ...5 Grounding faults Earth fault Occurrence of leakage current Check the status of grounding and insulation of wiring If it cannot be re operated make inquiries to service center 6 System frequency fault Under Over frequency System frequency fault Make inquiries to service center in the event of continuing fault after having contacted KEPCO 7 System voltage fault Under Over voltage System voltage fa...

Страница 27: ... event of breakdown during the warranty period under normal use repairs will be provided at no charge Warranty service at charge Repairs will be provided at charge in any of the following situations In the event of occurrence of breakdown due to intention or negligence of the user In the event of occurrence of breakdown due to defective connecting device arising from abnormality in the power used ...

Страница 28: ...of breakdown during the warranty period under normal use repairs shall be provided at no charge Warranty service at charge Repairs will be provided at charge in any of the following situations In the event of occurrence of breakdown due to intention or negligence of the user In the event of occurrence of breakdown due to defective connecting device arising from abnormality in the power used In the...

Страница 29: ...ecifications of this product can be changed without prior notification for purposes including improvement of quality Please inquire at the time of purchase DASS TECH CO LTD 109 Yangcheongsongdae gil Ochang eup Cheongwon gu Cheongju si Chungcheongbuk do 28118 Korea Tel 82 43 218 5670 Fax 82 43 218 5671 http www dasstech com Ver 1 3 ...