20
the closing screw exits the knob assembly.
8. The chuck knob assembly does not come
apart from this point.
TO REASSEMBLE:
Reassemble in reverse order.
CHUCK DESCRIPTIONS AND PART #’S
SA16400TA - 3-12 mm Standard Chuck
SA16450TA - 12-21mm Standard Chuck
SA16500TA - 21-30mm Large Drill Chuck
SA16975TA - 3-12mm Step Drill Chuck
SA16980TA - 12-21mm Step Drill Chuck
SA16890TA - 3-12mm 90° Chuck
SA16880TA - 12-21mm 90° Chuck
SA16916TA - 3-12mm Brad Point Chuck
SA16918TA - 12-21mm Brad Point Chuck
Chuck Information
5. Rotate chuck knob
counter clockwise
until the wrench
reaches the top of
the slot.
6. Remove wrench and
reinsert into the set
screw hole above the
slot.
7. Rotate the chuck knob counterclockwise until
Содержание XT3000i
Страница 1: ......
Страница 3: ...2...
Страница 9: ...8 XT 3000 Reference Drawing 230V Units Only...
Страница 11: ...10...
Страница 15: ...14...
Страница 25: ...24...
Страница 29: ...28...
Страница 31: ...30...
Страница 33: ...32 Wiring Diagram...
Страница 34: ...33 Electrical Diagram...
Страница 38: ...37 EXPLODED VIEW MACHINE...
Страница 39: ...38 EXPLODED VIEW SHARPENING FIXTURE 118 150...
Страница 40: ...39 EXPLODED VIEW ALIGNMENT ASSEMBLY...
Страница 43: ...43 Large Drill Attachment...
Страница 45: ...45 XY Table Attachment X Y Table No Sub Assemblies Send in for Repair...
Страница 46: ...46...
Страница 49: ...49 Countersink Attachment...
Страница 55: ...55 Step Drill Attachment...
Страница 58: ...58 90 120 Sharpening Attachment...