![DARAY X340 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/daray/x340/x340_operating-and-installation-manual_3488216031.webp)
Page 30 of 43
Pull the cable out in
this direction
4.6.6 Downtube adjustment and installation
The downtube provided will be either 1m as standard or 2m (optional) maximum.
It is DARAY`s recommendation that the bottom of the downtube is approximately
1900mm from the floor, therefore the minimum room height suitable for the
ceiling mounted light is 2.4m.
Below is a quick table showing situational examples of what length downtube would
be required
Height of Ceiling Plate from
Floor
Length of Downtube Required
2.4m
500
2.65m
750
2.9m
1000
3.4m
1500
3.9m
2000
The minimum length the downtube can be cut to is 500mm; this is due to the space
required for the internal second arm and the space required to attach the downtube
to the ceiling plate.
When cutting the downtube to length it is highly recommended that you pull the wire
back through the downtube so that you don’t cut through it. This can be achieved by
extending the secondary internal arm and pulling the wire down through the hole in
the bottom.
Содержание X340
Страница 1: ...X340 LED Examination Light Operating Installation Manual QAM X340 0519 9...
Страница 2: ...Page 1 of 43...
Страница 11: ...Page 10 of 43 X340LE4...
Страница 43: ...Page 42 of 43 Service Notes...
Страница 44: ...Page 43 of 43...
Страница 45: ...Page 44 of 43...
Страница 46: ...Page 45 of 43...
Страница 47: ...Page 46 of 43...