
Page 18 of 35
Mains Power
should be
inserted here
Fuse Holder around the front
- 3 Amp Fuse – D15998
4.1.6 Wiring and transformer layout
Before working on electrical connections please make sure that the
power to the light is switched off at the source and secured so that it
will not be turned on during your work.
Ideally the cable used to power the light should be of a 1.5mm twin and earth type.
Daray recommends that the power supplied uses an earthed switched fused spur,
protected with a 3amp fuse.
The above wiring is for modern wiring applications (post 2000). The cable from the
downtube will have a Molex connection on the end. This will attach to the opposite
Molex connection from the transformer.
To connect the cabling from the transformer into the main power you will need to
run this connection into the switched fused terminal point above. With the
connection secured you can now move the relevant cover up the downtube.
NOTE:
For suspended ceilings, slide the previously cut
tile back into place first,
then slide the trim up the downtube until it is firmly against ceiling tile, then roll the
trim retaining band upward until it holds the trim in position
NOTE:
For conventional ceilings
fit the cover, holding it in place with the retaining
band from the fitting kit.
The wiring should be as follows:
Live terminal
brown wire.
Neutral terminal
blue wire.
Earth terminal
green/yellow wire.
Содержание EXCEL
Страница 1: ...EXCEL LED Dental Examination Light Operating Installation Manual QAM EXCEL 0119 4...
Страница 2: ...Page 1 of 35...
Страница 7: ...Page 6 of 35 1 4 Technical Drawings...
Страница 8: ...Page 7 of 35...
Страница 13: ...Page 12 of 35 4 Installation Guide Section...
Страница 36: ...Page 35 of 35 Service Notes...
Страница 37: ...Page 36 of 35...
Страница 38: ...Page 37 of 35...
Страница 39: ...Page 38 of 35...