![DARAY BILITE Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/daray/bilite/bilite_operating-and-installation-manual_3489394018.webp)
18
NOTE:
For suspended ceilings cut a clearance hole in a ceiling tile, replace the tile and
slide the trim up the downtube until it is firmly against ceiling tile, then roll the trim
retaining band upward until it holds the trim in position.
NOTE:
For conventional ceilings fit the cover, holding it in place with the retaining band
from the fitting kit.
Install the primary arm
To ensure the smooth rotation of the arm, it is essential that the primary arm spigot is
lightly lubricated before assembly.
A sachet of silicon grease is provided.
Place the nylon washer over the primary arm spigot.
Insert the primary arm spigot into the down-tube.
Down-tube
Arm assembly
Nylon washer
Connector
Primary arm spigot
Down-tube
Suspended ceiling trim
Trim retaining band
Содержание BILITE
Страница 1: ... BILITE UNIT CEILING AND WALL MOUNTED OPERATING AND INSTALLATION MANUAL QAM BILITE 0811 7 ...
Страница 2: ......
Страница 4: ...4 info daray com www daray com ...
Страница 6: ...6 2 2 Dimensions 1 2 ...
Страница 7: ...7 ...
Страница 8: ...8 Dimensions 2 2 ...
Страница 20: ...20 ...
Страница 26: ...26 ...
Страница 32: ......
Страница 33: ...Marquis Drive Moira Derbyshire DE12 6EJ Tel 0844 375 9000 Fax 0333 321 0973 info daray co uk www daray co uk ...