17
Installation
: Mounting
en
Mounting
The enclosed bracket can and should be used, both for wall and for ceiling installation. The
bracket will automatically tilt the unit 1° towards the condensate drain, when mounted un-
derneath the ceiling.
Please follow this procedure to install the HCC 2 vertical onto a wall.
Step Action
Illustration
1
Drill two holes for the
bracket, fulfilling all dimen-
sion requirements shown in
the section “General location
8 mm
4 mm
3 mm
8 mm
4 mm
3 mm
11
12
14
2
Mount the bracket with ap-
propriate screws
3
Lift the unit onto the bracket
4
Drill and mount two appro-
priate screws in the lower
unit bracket
5
Connect ducts according il-
lustration at page 15
IMPORTANT: the T1 and T4
outside air ducts, must AL-
WAYS be routed to the duct
connections in the bottom
6
Connect ducts and drain
hose.
Multi purpose
mounting bracket
Fig. 16
Fig. 17
Wall mounting
Содержание HCC 2 ALU
Страница 1: ...HCC 2 ALU PLA E1 SERVICE MANUAL en de fr es da nl Rev 1 0 2019 W39 2 ...
Страница 2: ......
Страница 38: ...38 Appendix Week program specification ...
Страница 228: ...228 Appendix Schema s ...
Страница 229: ......
Страница 230: ......
Страница 231: ......