
HEXFLOW PRODUCT USER MANUAL
3
UNPACKING
|
SAFETY
UNPACKING, HANDLING, AND
INSPECTION
Thank you for purchasing a Dantherm HexFlow
heat exchanger. Please carefully review all
handling and installation instructions.
• The heat exchanger should be inspected on
initial delivery and any damage to packaging
noted.
• The unit should be maintained in the upright
position at all times.
• Special consideration should be given to
correctness of external packing damage or
abrasion, loose components and surface marks.
• Any damage should be added to the freight
bill and immediately notify the freight company
for filing a freight
claim.
• All packaging materials should be retained for
inspection.
Do not attempt to operate the unit if it appears
to be damaged.
GENERAL SAFETY
• Certain parts of electrical systems are
inevitably live or have high operating
temperatures. Observe caution at all times.
• Failure to observe these conditions and
installation instructions can cause injury and
damage.
• The system is to be installed and maintained
only by trained and qualified personnel.
• Do not apply power until all ground
connections have been made.
• The unit is fitted with pressed and folded
metal parts, which could have sheared metal
edges. Be cautious handling the unit, especially
when working in poorly accessible places.
• Check that no tools, test equipment, torches
etc. have been left in or on the equipment on
completion of work.
• Ensure the cover(s) and all mounting hardware
is firmly secured before leaving installation.
• All cable and connectors must conform to UL
standards.
• The heat exchanger is UL recognized
and tested to UL1995. It will comply where
necessary with the safety requirements as
defined in UL1995.