manualshive.com logo in svg
background image

© Danfoss A/S (Dept./Init.), 2014-05 

 VIILB102  

3

Installation 

 

The hot water heater should stand on a solid surface and be levelled with assistance from the setscrews underneath the 

tank. The tank models that come without setscrews can be levelled with assistance of a shim. This must be done before the 

tank is connected to the pipes and filled with water. Connections not in use must be plugged appropriately. During water 

filling, condensed water may emerge on the outside of the tank. This will result in water underneath the tank, on the floor. 

This will cease when the tank is heated. There must be a floor drain in the same room. 

All connections (including those not used) must be insulated to minimize idle losses.

Commissioning

 

Start by filling the tank, then pressurize it. Continue to fill the radiator system (the enclosed water). The working pressure 

may not exceed 10 bar (gauge), a safety valve with a releasing pressure of 10 bar must always be installed.

Maintenance

 

Check the safety valve annually by manually opening and closing the valve handle and making sure that water is released. 

Check annually all connections for eventual leakage (also peripheral installations, i.e. a heat pump, etc).

Electrical Installation

• 

The electrical installation must be performed by an authorized installer and follow applicable norms and regulations.

• 

When selecting electrical equipment, it must be selected with approved materials and enclosure class.

Pipe installation

The water heater must be supplied with:

• 

A safety valve

• 

A shut-off valve

• 

A drain valve

• 

A non-return valve

• 

A mixing valve

• 

A pressure gauge

• 

A vacuum valve as per applicable standards.

The water heater must be supplied with the prescribed safety equipment according to applicable local and national regula-

tions. The overflow pipe from the safety valve must not be able to be shut-off and must run visibly above the floor drain.

Содержание WT-S 500

Страница 1: ...Installation Guide WT S 500 WT S 1000 Danfoss A S Dept Init 2014 05 VIILB102 1 ...

Страница 2: ...iable or bound by warranty if these instructions are not adhered to during installation or service The English language is used for the original instructions Other languages are a translation of the original instructions Directive 2006 42 EC Copyright Danfoss A S ...

Страница 3: ...g pressure may not exceed 10 bar gauge a safety valve with a releasing pressure of 10 bar must always be installed Maintenance Check the safety valve annually by manually opening and closing the valve handle and making sure that water is released Check annually all connections for eventual leakage also peripheral installations i e a heat pump etc Electrical Installation The electrical installation...

Страница 4: ...ly an air water mixture comes out of the tap Water temperature Outgoing water temperature must not exceed applicable local and national regulations At higher heater temperatures a mixer valve can be installed to restrict the outgoing hot water temperature to a limit of 60 C The lower the temperature in the system the less heat loss from lines and valves Safety valve The safety valve must be inspec...

Страница 5: ...e 14 3 bar Working pressure 10 bar Rated temperature 95 C Weight 63 kg Required ceiling height for tilting min 1960mm WT S 500 Height mm 1850 Dimension ømm 734 Connection WT S 500 1 Connections 4x DN50 int 2 Circulation DN25 int 3 Temperature sensor conn DN15 int 4 Immersion heater conn DN50 int 2x Located on the backside 1 2 3 Technical data Dimensions ...

Страница 6: ...bar Working pressure 10 bar Rated temperature 95 C Weight 95kg Required ceiling height for tilting min 2500mm WT S 1000 Height mm 2295 Dimension ømm 990 Connection WT S 1000 1 Connections 4x DN50 int 2 Circulation DN25 int 3 Temperature sensor conn DN15 int 4 Immersion heater conn DN50 int 2x Located on the backside 1 2 3 4 Technical data Dimensions 1 ...

Страница 7: ...anfoss A S Dept Init 2014 05 VIILB102 7 1 2 2 2 2 We recommend that the insulation should be removed before moving the hot water tank This is done to minimize the risk of damaging the insulation WT S 1000 ...

Страница 8: ... occurring in catalogues brochures or other printed material Danfoss reserves the right to make changes to the design of its products with no prior warning The same applies to products already on order provided that the previously agreed specifications remain unchanged All trademarks in this material are the property of the respective company Danfoss and the Danfoss logotype are trademarks which b...

Отзывы: