
130BD391.11
1
2
3
4
5
6
7
8
9
10
Reset
Auto
On
Hand
On
OK
Back
Menu
Status
Quick
Menu
Main
Menu
PE
U
V
W
L1
L2
L3
PE
1
PLC
6
Minimum 200 mm (7.9 in) between control cables, motor, and
mains.
2
Frequency converter
7
Motor, 3-phase and PE
3
Output contactor (generally not recommended) 8
Mains, single-phase, 3-phase, and reinforced PE
4
Grounding rail (PE)
9
Control wiring
5
Cable shielding (stripped)
10
Equalizing minimum 16 mm
2
(6 AWG)
Illustration 2.2 Typical Electrical Connection
Product Overview
Design Guide
MG07B102
Danfoss A/S © 03/2016 All rights reserved.
13
2
2