manualshive.com logo in svg
background image

O p e r a t i o n

w i t h

t h e

Ta r g e t - P r o

2

11.

Fit a new

disposable tube

into the

pressure cap

, and

fit the cap to the bottle sampling unit.

12.

Connect the 0.5m

fluid sampling hose

to the bottle

sampling connection.

13.

Connect the fluid sampling hose to the

HP connection

on the analyzer.

14.

Switch on the analyzer.

15.

Press the

set button

[5] on the Main/Test

Progress Screen to select the Triple or Bottle
sampling option.

16.

Enter

test details

as described on page 4.

9

Vickers by Danfoss Target-Pro 2 Analyzer and Sampler Operation Manual V-PP-MC-0002-E

July 2023

17.

Turn the

selector knob

to Sample.

18.

Switch on the bottle sampling unit.

19.

Press the

flush valve pushbutton

to open the

flush valve for 10 seconds.

20.

Press the

start button

[1] to begin testing.

The bottle sampling test is a three-test analysis; see
page 4 for details.

21.

When the test is finished, switch off the bottle sampling
unit; it will automatically vent the pressurized chamber to
the atmosphere.

22.

Switch off the analyzer.

S a m p l e

B o t t l e

C l e a n i n g

P r o c e d u r e

Use qualifying and controlling methods that conform to ISO
3372 for sampling containers. If compliant procedures are
not possible, follow these guidelines at a minimum:

1.

Half-fill the sampling bottle with the fluid to be analyzed.

2.

Re-cap the bottle and shake it vigorously for 30 seconds.

3.

Discard the fluid, following current COSHH legislation.

4.

Repeat steps 1–3 twice, for a total of three cycles. The
fourth time the bottle is filled, analyze the sample.

Alarm/Indication Switching
during Continuous Operation

The Target-Pro 2 can be wired to an
external alarm to indicate testing
status during continuous sampling. It
incorporates two solid-state relays,
shown in these diagrams.

Each relay is designed for a maximum
current of 1 amp at 24 volts nominal
AC or DC (absolute maximum 60 volt
peak). Operation above these limits
will cause irreparable damage to the
relays. Danfoss strongly recommends
using wire of at least 20 AWG, and
installing a fuse between the
customer circuit and the Target-Pro 2.

External Wiring Details

Example 2:

Bulb switches on during sampling, and off when target cleanliness level

is achieved (completed status). Relay 1 is also switched during Normal, Dynamic &
Triple bottle test types. Relay will open at test end or when stop button is pressed.

Example 1:

Bulb stays off during sampling, and switches on when target

cleanliness level is reached (completed status).

Note:

An external signal, such as a monitoring light, buzzer or bell, is not necessary for continuous sampling.

Use of this annunciator circuit is optional.

Содержание Vickers Target-Pro 2

Страница 1: ...Vickers by Danfoss Target Pro 2 Analyzer and Sampler Operation Manual...

Страница 2: ...and Sampler Operation Manual V PP MC 0002 E July 2023 Target Pro 2 Laser Particle Analyzer User Guide September 2004 Contents Operating Precautions 2 Introduction 3 ISO Cleanliness Code 3 Target Pro 2...

Страница 3: ...d using mineral oil as the operating fluid The analyzer uses the light extinction principle in which two lasers are projected through the fluid and toward photo diodes Particles that interrupt the bea...

Страница 4: ...5 to program the analyzer The display will show the Operations Screen To change analyzer settings follow this sequence 1 Test Reference Press 1 enter your reference details up to 16 characters and pre...

Страница 5: ...previoustest and elimi nates cross contamination between samples 8 Press the flush valve push button to close the flush valve pushbutton light goes off Alternate method Proceed to step 9 pressing the...

Страница 6: ...essel vented to the atmosphere To conserve battery life connect the analyzer to the power adapter for continuous operation Continuous Sampling Basic Operation 1 Follow instructions 1 5 on page 4 to se...

Страница 7: ...ogging Press 4 once to log every test repeat press 4 again to deselect logging Note If you deselect log every test the analyzer will only store the test results when the Target Cleanliness Level is ac...

Страница 8: ...n appropriate solvent such as mineral spirits before taking a sample Do not use acetone Clean sample bottles and associated products following the instructions on page 13 2 Draw at least 80ml of fluid...

Страница 9: ...a minimum 1 Half fill the sampling bottle with the fluid to be analyzed 2 Re cap the bottle and shake it vigorously for 30 seconds 3 Discard the fluid following current COSHH legislation 4 Repeat step...

Страница 10: ...from the PC menu 6 When the transfer is complete switch the analyzer off Software Installation The internal battery can sustain 8 hours of continuous oper ation approximately 100 tests after charging...

Страница 11: ...press the flush valve and see if fluid passes into the waste disposal bottle Body text Note If you suspect high water aeration levels contact Danfoss for advice Warning If excessive system contaminat...

Страница 12: ...roscope counting examines the particles differently from APCs the code is given with two scale numbers only These are at 5 m and 15 m equivalent to the 6 m c and 14 m c of the APCs ISO 4406 Cleanlines...

Страница 13: ...ers These relate to the use of the correct viscosity mineral fluid An even cleaner level may be needed if the operation is severe such as high frequency fluctuations in loading high temperature or hig...

Страница 14: ...000 25 23 17 100 000 CorrelationbetweenParticleSizesObtainedusingACFTDandNIST CalibrationMethods Particle Size Obtained Using ACFTD SIZE ISO 4402 1991 ISOMTD NIST ISO 11171 size m m c 1 4 2 2 4 6 3 5...

Страница 15: ...required by ISO 9000 QS9000 and similar quality management sys tems A procedure for determining the performance of APCs means the user can set minimum acceptablelevels Benefits include improved calib...

Страница 16: ...Phone 45 7488 2222 Danfoss Power Solutions US Company 2800 East 13th Street Ames IA 50010 USA Phone 1 515 239 6000 Danfoss Power Solutions Trading Shanghai Co Ltd Building 22 No 1000 Jin Hai Rd Jin Q...

Отзывы: