7. Connect the two plugs of the DC bus test
harness into the Soft Start Board. See Figure 11
(Connect Test Harness to Compressor).
8. Route the cables through the cable passage on
either side of the HV DC-DC Converter, down into
the service side. See Figure 12 (Cable Passage).
Figure 11 - Connect Test
Harness to Compressor
Figure 12 - Cable Passage
• • • DANGER • • •
The DC bus test harness is not designed to be left in the compressor during normal operation. When checks are complete,
disconnect and remove the test harness.
9. Reinstall the Mains Input Cover and Top
Cover.
Cable Passage
Содержание Turbocor TG230
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 4: ...4 of 132 M SV 001 EN Rev E THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 12: ...12 of 132 M SV 001 EN Rev E THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 28: ...28 of 132 M SV 001 EN Rev E Compressor Fundamentals Figure 18 Compressor Energy and Control Flow Block Diagram ...
Страница 61: ...61 of 132 M SV 001 EN Rev E Compressor Components Figure 56 Stator Thermistor R T Curve 1 ...
Страница 120: ...120 of 132 M SV 001 EN Rev E THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 130: ...130 of 132 M SV 001 EN Rev E Notes ...