3.0 Safety notes

3.1 Safety Notes – general

The following instructions refer to the standard design of
substation. Special versions of substations are available on
request.

This operating manual should be read carefully before installation
and start-up of the substation. The manufacturer accepts no
liability for damage or faults that result from non-compliance with
the operating manual. Please read and follow all the instructions
carefully to prevent accidents, injury and damage to property.
Assembly, start-up and maintenance work must be performed by
qualified and authorized personnel only.
Please comply with the instructions issued by the system
manufacturer or system operator.

Corrosion protection

All pipes and components are made of stainless steel and brass.
The maximum chloride compounds of the flow medium should not
be higher than 150 mg/l.
The risk of equipment corrosion increases considerably if the
recommended level of permissible chloride compounds is
exceeded.

Energy source

The substation is designed for district heating as the primary
source of energy. However, also other energy sources can be used
where the operating conditions allow it and always are comparable
to district heating.

Application

The substation is designed to be connected to the house
installation in a frost-free room, where the temperature does not
exceed 50 °C and the humidity does not exceed 60%. Do not cover
or wall up the substation or in any other way block the entrance
to the station.

Choice of material

Choice of materials always in compliance with local legislation.

Safety valve(s)

We recommend mounting of safety valve(s), however, always in
compliance with local regulations.

Connection

The substation must be equipped with features that ensure that
the substation can be separated from all energy sources (also
power supply).

Emergency

In case of danger or accidents - fire, leaks or other dangerous
circumstances - interrupt all energy sources to the station if
possible, and seek expert help.
In case of discoloured or bad-smelling domestic hot water, close all
shut-off valves on the substation, inform the operating personnel
and call for expert help immediately.

Storage

Any storage of the substation which may be necessary prior to
installation should be in conditions which are dry and heated.

Authorized personnel only

Assembly, start-up and maintenance work must be performed by
qualified and authorized personnel only.

Please observe instructions carefully

To avoid injury to persons and damage to the device, it is absolutely
necessary to read and observe these instructions carefully.

Warning of high pressure and temperature

Be aware of the installation’s permissible system pressure and
temperature.

The maximum temperature of the flow medium in the substation is
120 °C.

The maximum operating pressure of the substation is 10 bar. PN 16
versions are available on enquiry.

The risk of persons being injured and equipment damaged increases
considerably if the recommended permissible operating parameters

are exceeded.
The substation installation must be equipped with safety valves,

however, always in accordance with local regulations.

Warning of hot surface

The substation has got hot surfaces, which can cause skin burns.

Please be extremely cautious in close proximity to the substation.
Power failure can result in the motor valves being stuck in open

position. The surfaces of the substation can get hot, which can cause
skin burns. The ball valves on district heating supply and return should

be closed.

Warning of transport damage

Before substation installation, please make sure that the substation

has not been damaged during transport.

IMPORTANT - Tightening of connections

Due to vibrations during transport all flange connections, screw joints
and electrical clamp and screw connections must be checked and
tightened before water is added to the system. After water has been
added to the system and the system has been put into operation,
re-tighten

ALL

connections.

4

DEN-GT

VI.EH.D4.02 / LUK41570

Danfoss District Energy

Содержание Termix BL

Страница 1: ...al connections 7 5 0 Design 8 5 1 Design 8 5 2 Schematic diagram 9 5 3 Design 10 5 4 Schematic diagram 11 6 0 Controls 12 6 1 DHW temperature control 12 6 2 Other 13 6 3 Maintenance 14 7 0 Troubleshoo...

Страница 2: ...Operating Guide Termix BL 2 DEN GT VI EH D4 02 LUK41570 Danfoss District Energy...

Страница 3: ...t exchangers Domestic hot water DHW The Termix BL is available for charging systems with large momentary demands for hot water or in installations with relatively low supply capacity The Termix BL cha...

Страница 4: ...rcumstances interrupt all energy sources to the station if possible and seek expert help In case of discoloured or bad smelling domestic hot water close all shut off valves on the substation inform th...

Страница 5: ...rict heating DH return 3 Hot water circulation HWC 4 Domestic hot water DHW 5 Domestic cold water DCW Connection sizes DH DCW DHW G 1 int thread HWC G int thread Dimensions mm Type 2 5 without cover H...

Страница 6: ...rior to installation all substation pipes and connections should be cleaned and rinsed Tightening Due to vibration during transport all substation connections must be checked and tightened before inst...

Страница 7: ...onnection The substation must be electrically connected so that it can be disconnected for repairs Outdoor temperature sensor Outdoor sensors should be mounted so as to avoid exposure to direct sunlig...

Страница 8: ...might look different than the substation shown Design description B Heat exchanger DHW G Electronic controller DHW 2 Single check valve 11 Domestic hot water pump 27 Actuator 30 Flow control with cont...

Страница 9: ...lve L Border of delivery 18 Thermometer 40 Immersion sensor 1 Ball valve 19 Surface sensor 43 Ball valve closed 2 Single check valve 24 Delivered loose with unit 44 Immersion sensor DHW Domestic Hot W...

Страница 10: ...ferent than the substation shown Design description B Heat exchanger DHW 13 Charging pump G Electronic controller DHW 27 Actuator 2 Single check valve 30 Flow control with control valve 11 Domestic ho...

Страница 11: ...pump 40 Immersion sensor L Border of delivery 18 Thermometer 43 Ball valve closed 1 Ball valve 19 Surface sensor 44 Immersion sensor 2 Single check valve 27 Actuator DHW Domestic Hot Water DCW Domest...

Страница 12: ...losed completely the handle is turned all the way to the top 2 One tap is opened 3 The small valve is set at the desired temperature 50 C The set point is marked and the valve is closed completely 4 S...

Страница 13: ...ed The blow off pipe outlet should be placed so that it discharges freely and it is possible to observe any dripping from the safety valve It is recommended to check the operation of safety valves at...

Страница 14: ...all temperatures such as DH supply temperature and DHW temperature Connections Checking all connections for leakages Safety valves The operation of the safety valves should be checked by turning the...

Страница 15: ...e or clogged non return valve Replace clean No electricity Check Wrong setting of automatic controls if any To adjust an electronic controller for DHW pls note enclosed instructions for electronic con...

Страница 16: ...posal Disposal This product should be dismantled and its components sorted if possible in various groups before recycling or disposal Always follow the local disposal regulations 16 DEN GT VI EH D4 02...

Страница 17: ...Operating Guide Termix BL Danfoss District Energy VI EH D4 02 LUK41570 DEN GT 17...

Страница 18: ...conformity applies Substations Category 0 with electrical equipment Unless fitted with a yellow label PED KAT 1 on the substationlabel then the following declaration of conformity applies Substations...

Страница 19: ...Operating Guide Termix BL Category 1 with electrical equipment Danfoss District Energy VI EH D4 02 LUK41570 DEN GT 19...

Страница 20: ...Operating Guide Termix BL Produced by Danfoss A S 02 2017...

Отзывы: