SONO 3500 CT
Operating Instructions, 07/2019, VI.SH.P2.02
37
Commissioning
6
Commissioning the device includes the following steps:
1. Resetting the battery lifetime, see Start-up routine (Page 39).
2. Configuring the device via SIMATIC PDM, see Commissioning via PDM (Page 40).
It is recommended to read the basic guide to the local display and the menu structure in
Operating the local display (Page 37) and Navigating the menu structure (Page 38) before
commissioning the device.
6.1
Operating the local display
The local display is divided into 3 areas:
●
Top area with symbols for status information
●
Mid area with actual readings
●
Lower area with index number of the shown menu
Activate the push button to go the next index menu and related information.
Figure 6-1
Operating the local display
Table 6- 1
Status information symbols
Symbol
Description
Mains power supply connected
Battery charge status
Warning
Содержание SONO 3500 CT
Страница 1: ...Ultrasonic Flowmeter Operating Instructions SONO 3500 CT 07 2019 Edition ...
Страница 2: ......
Страница 8: ...Table of contents 6 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 14: ...Introduction 1 5 Further Information 12 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 38: ...Electrical connection 5 5 Sealing of SONO 3500 CT 36 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 50: ...Commissioning 6 4 Commissioning via PDM 48 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 54: ...Functions 7 4 Hardware key 52 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 64: ...Service and maintenance 8 7 Battery disposal 62 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...