11. Maintenance plan
Maintenance plan (recommendations)
*)Enduser/caretaker.
Note! After maintenance work has been carried out all gaskets HAVE to be replaced.
Interval
Maintenance work
Comments
At least once per month
Read meter and check the system for leaks
Note the read meter values in a control book - contact authorized person-
nel immediately in case of leaks or other irregularities
At least once a year
Check all connections for leaks
If you identify a leak, replace the gaskets and retighten the pipe connec-
tions
Check that the safety valves are functioning correctly.
Check the functionality by turning the lever on the safety valves
Check that all components are intact and functioning as
intended
In the event of irregularities, lack of functionality or visible faults and
defects in a component, replace the component in questionn
Clean all dirt filters/strainers in the unit
Replace any filters that are not intact
Check that any electrical cables are in serviceable condition
and that it is possible to disconnect the electrical power
supply to the unit
Visual check. Check whether it is possible to disconnect the current to
the unit.
Check the pipes and exchanger for signs of corrosion
Visual check
Check that insulation cover, if any, is functioning as intended
Check that the insulation fits tightly around the product/unit
Check that the temperature regulators are set in accordance
with the instructions in this manual
Follow the instructions in the present manual
Check the functions of all shut-off valves
Check that the ball valves open and close as they should