background image

© Danfoss | DCS (ms) | 2020.01

2 | AN331637222900en-000101

4. 

Install the ICAD actuator on the ICM adapter making sure it is pushed 

completely down. Fasten the the 3 set screws using a 2.5 mm hexagon key.

Note!

Crosstighthen all 3 screws to ensure equal tightening. 

Max 3 Nm torque. 

For ICM in operation

When ICAD is installed/serviced, on a cold/frozen valve; do the following:

1.

Make sure the old grease is totally removed before mounting a new EPDM 

O-ring and PTFE support ring.

2.

If there is any ice or moisture present, it must be removed prior to applying 

the grease. The ice/moisture can be removed with an electrical hot air gun.

3.

After ice removal by heater, ensure that the ICM adapter is totally dry before

mounting new EPDM O-ring and PTFE support ring

Отзывы: