background image

© Danfoss A/S (MR-MC/MWA), 09-2008   

DKRCI.PI.KN0.A1.7G / 520H3076 

1

148R9546

148R9546

 

Instructions

 

 

 

GPS 40-150

Refrigerants

R717 (ammonia)), R22, R134a, R404A,

R407, R407B, R407C, R744.

Installation

GPS valves in sizes DN 100 to DN 150 are

always installed in vertical position fig. 2a.

GPS valves in other sizes are installed as

shown in fig. 2b, i.e. in 90° from vertical

position with pilot valve and side branch

downwards. If there is welding slag and/or

dirt in the system, it is strongly recommen-

ded to install strainers in connection with

the GPS valve. 

It is important always to install strainers in 

the pipes leading to the pilot valves.

Flow direction

IMPORTANT: The flow direction must be

from the side branch towards the cone

(fig. 2a+2b).

Welding

Remove the actuator before welding (fig.

3). OBS: Be sure not to damage the

teflon cone ring and the spindle. If

these parts are damaged the valve

will leak.

Assembling

Remove welding slag and dirt from pipes

and housing. The valve cone is protected

with a cap. (B) Remove this cap before

the valve is assembled (fig.3). OBS: Only

1 hot gas supply is required (Cf. Illustration

A on fig. 4a); connect this supply to the 

pilot valve armature.

Tightening

Use a torque wrench to tighten the 8 bolts

connecting the housing with the actuator.

Tighten the bolts in accordance with the

table fig. 4b.

Manual opening

For instance by failure of current, see

instruction overleaf.

Colours

In factory the valve housings are painted in

a oxide yellow primer. The actuator is

metallized.

ENGLISH

Fig. 1

Installation

Fig. 2a

Fig. 2b

Fig. 3

Fig. 4a

Fig. 4b

GPS 100-150

GPS 40-80

Nm

ft. lb.

DN 40-50

=

40

30

DN 65-80

=

40

30

DN 100

=

70

52

DN 125

=

150

110

DN 150

=

300

220

Содержание GPS 40-150

Страница 1: ... Welding Remove the actuator before welding fig 3 OBS Be sure not to damage the teflon cone ring and the spindle If these parts are damaged the valve will leak Assembling Remove welding slag and dirt from pipes and housing The valve cone is protected with a cap B Remove this cap before the valve is assembled fig 3 OBS Only 1 hot gas supply is required Cf Illustration A on fig 4a connect this suppl...

Страница 2: ...en daß weder Teflonkegelring noch Spindel beschädigt werden was Undichtigkeiten zur Folge haben wird Sammlung Schweißschlacken und Schmutz von Rohren und Gehäuse entfernen Der Ventilkegel ist mit einer Schutzkappe B versehen Diese Kappe vor Sammlung des Ventils entfernen OBS Nur 1 Heißgas zuleitung ist erforderlich vgl Illustration A der Figur 4a diese Zuleitung ist an die Armatur der Magnetventil...

Страница 3: ...sealing elements E Mount the O ring 19 and then the sealing ring 17 as shown in fig 6 Important Fold the sealing ring as shown Be certain that there are no sharp folds and do not use tools to mount the sealing ring F Mount the O ring 20 and then the sealing ring 18 as shown in fig 7 In order not to damage the ring use 2 plastic strips to pull the ring to the right place G Mount the O rings 66 on n...

Страница 4: ... bei Wiederauf bereitung des Ventils zu ersetzen Das Ersatzteilset für die GPS Ventile enthält alle Dichtungselemente E Montieren Sie den O ring 19 und danach den Dichtungsring 17 siehe hierzu Abb 6 Wichtig Falten Sie den Dichtungsring wie abgebildet Achten Sie darauf daß keine scharfen Knicke entstehen und verwenden Sie keine Werkzeuge um den Dictungsring zu montieren F Montieren Sie den O ring 2...

Отзывы: