Transportation
Heavy equipment. Handle with care during transportation.
Electric machine is shipped in rst class condition. It has been inspected and packed correctly to
prevent damage from ordinary handling during shipment. During transportation, shocks, fails and
humidity should be avoided. Protect the cooling holes for transportation.
The weight of the electric machine can be found on the machine rating plate, and in the product
data sheet.
Receiving and unpacking
Do not touch the electric machine during the insulation resistance check. Discharge the electric machine afterwards.
Check upon arrival and unpacking
The electric machine and the package must be inspected immediately upon arrival. Make
sure that the rating plate data in the cover letter complies with the purchase order. Any
external damage (in rotor, anges, electrical interfaces and paint) must be photographed and
reported immediately.
It is recommended to measure the insulation resistance of the machine upon arrival, or before
installing the electric machine. Reference value of 150 MΩ shall be exceeded in room
temperature, otherwise contact Danfoss representative.
Lifting
Use correct, adequately dimensioned lifting devices and inspect them before lifting.
Do not apply any excess weight on the electric machine when lifting.
Use correct lifting slings. Use correct position and angle of lifting. Permissible range of lifting angles is from 0° to 30º.
See the electric machine rating plate and data sheets for weight information.
Lift the electric machine using the correct lifting lugs/eyes only.
Do not go under a lifted load.
EM-PME375
5. Transportation and storage
30 |
©
Danfoss | Produced By: Danfoss Power Solutions | July 2019
| BC265857345808en-000101
Содержание EM-PME375 Series
Страница 1: ...User Guide Integrated Motor Generator EM PME375 danfoss com...
Страница 60: ......