Menu
Sub menu
Sub menu
Sub menu
INTEGRAL A1
HYSTERESIS
MAX RETURN
START INTERVAL
ALARM BRINE
PRESS. PIPE
OUTDOOR STOP
SHUNT TIME
SHUNT COOLING
AUX. HEATER
MAX STEP
INTEGRAL A2
HYSTERESIS
MAX CURRENT
HOT WATER STOP
DELAY AFTER EVU
EXT.AUX.HEATER
EXT.AUX.HEATER
INTEGRAL A3
TURN OFF DELAY
REV.V. HOT WATER
TOPH. EXT
MANUAL TEST
MANUAL TEST
HEAT PUMP
CIRC. PUMP
REV.V. HOT WATER
SHUNT
SYSTEM SHUNT
HGW-SHUNT
AUX. HEAT 1
AUX. HEAT 2
AUX. HEAT 3
EXT.AUX.HEATER
EXT. CIRC. PUMP
ALARM
SHUNT COOLING
SHUNT GROUP
2ND H.C SHUNT
PASSIVE COOLING
COOLING A
REV. V. POOL (Expansion
card)
0-10V
Table 7.
Used to change the heat pump's default settings. (continued)
Menu
Sub menu
Sub menu
Sub menu
Sub menu
SERVICE
INSTALLATION
SYSTEM
HEAT SOURCE
GROUND OR ROCK
OUTSIDE AIR
BRINE SOLUTION
DIRECT EVAP.
COOLING
Installation instructions
VMIFJ102
– 29
Содержание DHP-S&DP
Страница 1: ...Installation instruc tions DHP S DP VMIFJ102 ...
Страница 4: ......