D
GB
F
E
© Danfoss | Climate Solutions | 2023.06
AQ452755960718en-000201 | 19
5
|
Electrical connection
Relay position INT69 G
B2 12 14 11
5.7 Function test of the trigger unit INT69 G
Before commissioning, after troubleshooting or making changes to the control power circuit, check
the functionality of the trigger unit. Perform this check using a continuity tester or gauge.
Gauge state
Relay position
1.
Deactivated state
11-12
2.
INT69 G switch-on
11-14
3.
Remove PTC connector
11-12
4.
Insert PTC connector
11-12
5.
Reset after mains on
11-14
5.6 External connection INT69 G
BT1
Cold conductor (PTC
sensor) motor winding
BT2
Heat protection thermo-
stat (PTC sensor)
EB1
Oil sump heater
Οnderung
1
0
Datum
Name
Datum
Bearb.
Gepr.
Norm
1
04.12.2009
bauknecht
08.05.2020
Urspr.
2
Ers. f.
3
Ers. d.
4
HG22e/34e HC
5
6
7
BOCK COMPRESSORS
8
=
+
9
Bl.
5
Bl.
3
2
Schaltschrank
EB1
BT2
BT2
BT1
1 2 3 4 5 6 7 8 09 10 11 12
INT69G
Οnderung
1
0
Datum
Name
Datum
Bearb.
Gepr.
Norm
1
04.12.2009
bauknecht
08.05.2020
Urspr.
2
Ers. f.
3
Ers. d.
4
HG22e/34e HC
5
6
7
BOCK COMPRESSORS
8
=
+
9
Bl.
5
Bl.
3
2
Schaltschrank
EB1
BT2
BT2
BT1
1 2 3 4 5 6 7 8 09 10 11 12
INT69G
Switch cabinet
Fig. 19
Fig. 20
Terminal box