background image

Instructions for installation and use 

 

Akva Lux II VXe

4 | © Danfoss | Produced by Danfoss Redan A/S | 2021.02

xxxxxxx

Reach

All products of the Akva Lux II Triiiple series comply with the provisions 

of the REACH regulation.

We are therefore obliged to inform our customers about the presence 

of substances according to the SVHC candidate list, if they are present. 

We hereby inform you: This product contains brass parts containing lead 

(CAS 7439-92-1) in a concentration above 1% (w/w)

.

Potential equalization / grounding

Equipotential bonding is understood as all measures for eliminating elec-

tri-cal potential differences (contact voltages), which can occur between 

eg two pipelines. Equipotential bonding is an important measure for pro-

tec-tion against electric shock. Equipotential bonding reduces corrosion 

in the heat exchanger, instantaneous water heaters, district heating sta-

tions and plumbing installations. Equipotential bonding should be in ac-

cordance with the provisions 60364-4-41: 2007 and IEC 60364-5-54: 2011. 

Binding point is marked with a grounding symbol on the bottom right 

corner of the mounting plate and there is a hole in the mounting plate 

and a label with grounding symbol.

Disposal

The station consists of materials that must not be disposed of with 

household waste. Disconnect the entire energy supply and disassem-

ble the product for disassembly and dispose of it in accordance with 

local regulations.

Disposal

Dispose of the packaging in accordance with the local regulations for 

disposal of used packaging materials.

The substation is made of materials that cannot be disposed of together 

with household waste.  

Close all energy sources and disconnect all connection pipes. Disconnect 

and dismantle the product for disposal in accordance with the applicable 

local regulations for the disposal of the individual components.

2.

 INSTALLATION INSTRUCTIONS, SAFETY AND HANDLING

Содержание Akva Lux II VXe

Страница 1: ...stallation and use VXe Fully insulated for very low heat losses Indirect district heating substation for heating and domestic hot water Indirect fully insulated district heating subtation Akva Lux II...

Страница 2: ...r and safety valves 10 7 0 Filling the system with water 11 8 0 Recirculation 12 9 0 Electrical connections 13 10 0 Adjustmend and commissioning 14 11 0 Heating circuit Danfoss ECL 310 automatics 15 1...

Страница 3: ...must be stored in a dry heated i e frost free room Relative humidity max 80 and storage temperature 5 70 C Theunitsmustnotbestackedhigherthanthelimitatthefactory max 8layers Unitssuppliedincardboardpa...

Страница 4: ...aters districtheatingsta tionsandplumbinginstallations Equipotentialbondingshouldbeinac cordancewiththeprovisions60364 4 41 2007andIEC60364 5 54 2011 Binding point is marked with a grounding symbol on...

Страница 5: ...ansion bolts or similar 2 Tighten all pipe connections as they may have loosened during transport and handling 3 Mount the district heating meter see page 11 4 On systems that feature a safety valve e...

Страница 6: ...g of heat meter See page 10 Safety valves See page 10 Re circulation See page 12 Electrical connection See page 13 Outdoor sensor Connect to terminal block U Commissioning See page 17 22 Reading of me...

Страница 7: ...ET 120 mm for DVGW Circulation pump HE Safety valve HE 3 bar Safety valve DHW 10 bar Thermometer Manometer connection Manometer Expansion vessel 12 L Sensor pocket for heat meter Plugs with O Ring Fit...

Страница 8: ...l valve ET ET 120 mm for thermometer manometer Ball valve IT ET 120 mm for thermometer Ball valve ET ET 120 mm for DVGW Circulation pump HE Safety valve HE 3 bar Safety valve DHW 10 bar Thermometer Ma...

Страница 9: ...14 Manometer connection 15 Manometer 16 Expansion vessel 12 L 65 100 80 80 80 80 65 1 2 3 4 5 6 550 932 315 55 1 Fjv frem 2 Fjv retur 3 Varme retur 4 Varme frem 5 V V 6 K V Danfoss Standard A3 1 6 Mat...

Страница 10: ...ions and shocks during transport and handling may have caused leaks Once the system has been filled with water tighten all the pipe connections once more before performing pres sure test for leaks Aft...

Страница 11: ...ng pressure test for leaks Before filling the system with water and starting up check if pipes are connected according to the circuit diagram expansion vessel is connected heat meter is mounted shut o...

Страница 12: ...r use a 6 mm Allen key Do not re use the plugs Fig 4 Remove demunt capillary tube onT piece Fig 5 Seal offT piece with a 4 mm plug 5 Fig 6 Fit screw circulation hose end steel hose onto the controller...

Страница 13: ...ons The outdoor sensor is always to be mounted on the coldest side of the property where it is less likely o exposed to direct sunshine normally the north side of the property The sensor must not be e...

Страница 14: ...according to the instructions on page 11 If the pressure drops below 1 bar water must be added to the sys tem The operating pressure should never exceed 1 5 bar The safety valve opens at 2 5 bar The...

Страница 15: ...bed in the instructions on page 15 proceed as follows 1 Connect the controller and switch it on 2 Choose MENU in any circuit Confirm and turn the dial and choose Common controller settings in the circ...

Страница 16: ...th electrical actuators AMV and ECL electronic controllers the flow and temperature can be controlled to achieve highest energy savings The controller is equipped with excess pres sure safety valve wh...

Страница 17: ...d with a safety thermostat Jumo AT for protection against overheating From factory the Jumo AT safety thermostat is pre wired to the Danfoss ECL controller with a 2 m cable enabling the thermostat hou...

Страница 18: ...y to Proportional pressure AUTOadapt The user interface shows performance view during operation operation status alarm status settings view after pressing the button During operation the display shows...

Страница 19: ...rm status In case the 1st LED is red the pump has detected one or more alarms See fig 5 Alarm status When there is no active alarm anymore the user interface switches back to operation mode shortly an...

Страница 20: ...ve to wait a long time i e more than20sec forhotwater itmaybenecessarytosetthethermostat at a higher value If you want to avoid waiting time altogether you will need to set up domestic hot water recir...

Страница 21: ...because aerated water is used on the secondary side If it becomes necessary to clean the exchanger with acid this canbedoneasshownonthedrawingtotheright Brazedplateheat exchangers can withstand rinsi...

Страница 22: ...uestionn Clean all dirt filters strainers in the substation Replace any filters that are not intact Check that any electrical cables are in serviceable condition and that it is possible to disconnect...

Страница 23: ...the valve housing Automatic components controller incorrectly adjusted or defective or possibly power outage The pump is not working The pump is set at too low speed of rotation not all system types A...

Страница 24: ...no air in the pump housing No hot water Dirt strainer in the district heating sup ply line clogged Defective DHW controller Defective sensor PTC2 Clean the dirt strainer Check controller settings You...

Страница 25: ...Instructions for installation and use Akva Lux II VXe Danfoss Produced by Danfoss Redan A S 2021 02 25 xxxxxxxxxxxxxxx 17 EU DECLARATION OF CONFORMITY...

Страница 26: ...h all technical regulations and the applicable legislation in every respect Installation and commissioning must only be performed by trained authorised personnel The substation is checked in the facto...

Страница 27: ...Instructions for installation and use Akva Lux II VXe Danfoss Produced by Danfoss Redan A S 2021 02 27 xxxxxxxxxxxxxxx...

Страница 28: ...28 Danfoss Produced by Danfoss Redan A S 2021 02 xxxxxxx...

Отзывы: