background image

Service guide | Disassembling and assembling iSave 21 vane pump with upgrade kit 180F4161

2

180R9402 | 521B1455 | DKCFN.PI.003.T1.02 | 10.2017

Table of Contents

1. 

General Introduction

 

Contents

1. 

General Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2

1.1 

Parts included in the vane pump upgrade kit 180F4161  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2

2. 

Disassembling the iSave   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3

2. 

Disassembling the vane pump  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4

3. 

Assembling the vane pump - with parts from the vane pump upgrade kit  . . . . . . . . . . . . . . . .6

4. 

Assembling the iSave. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9

5. 

Exploded view vane pump  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10

6. 

Exploded view iSave . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11

1.1  Parts included in the vane pump  

    

 

upgrade kit 180F4161

This document covers the instructions for 
installing the vane pump upgrade kit 180F4161.

Important: It is essential that the iSave and 
vane pump are serviced in conditions of abso-
lute cleanliness.

For a better understanding of the vane pump and 
iSave, please see the exploded views in the sec-
tions 5 and 6.

The weight of the iSave is 65 kg / 143 lb 
and it must be lifted with suitable lifting 
equipment.

To prevent cold welding, lubricate threads of 
screws with grease;  screw them into the compo-
nent and tighten them by the hand. Use PTFE 
lubrication type.

Tools needed for upgrading vane pump::
-   10 mm  socket
-   Torque wrench
-   Adjustable spanner
-   Loctite 270
-   6 mm allen key socket (160 mm long)

Qty.

Description

1

Stator ring

8

Vanes

1

Side plate out

1

Side plate in

4

Peek pin Ø6.9

2

Pin Ø6x10

2

Pin Ø4x9

3

O-ring 112x2.5

1

O-ring 44x3

1

O-ring 80x2

2

Steel location pin for stator ring

10

Screws for M8x16

10

Screws for M8x25

8

Screws for M8x65

Содержание 180F4161

Страница 1: ...Service guide Vane pump upgrade kit 180F4161 iSave 21 ERD Disassembling and assembling hpp danfoss com...

Страница 2: ...ant It is essential that the iSave and vane pump are serviced in conditions of abso lute cleanliness For a better understanding of the vane pump and iSave please see the exploded views in the sec tion...

Страница 3: ...g and assembling iSave 21 vane pump with upgrade kit 180F4161 3 180R9402 521B1455 DKCFN PI 003 T1 02 10 2017 1 Place the iSave on a clean table 3 Remove the vane pump 2 Unscrew the bolts in the flange...

Страница 4: ...03 T1 02 10 2017 1 Gently adjust the spanner wrench around the coupling and use it as back stop 3 Remove all bolts in the HP out connection flange 2 Unscrew the bolt in the middle of the coupling and...

Страница 5: ...embling iSave 21 vane pump with upgrade kit 180F4161 5 180R9402 521B1455 DKCFN PI 003 T1 02 10 2017 7 Gently remove the rotor Note Loose parts inside the rotor 8 Remove vanes 9 Gently remove side plat...

Страница 6: ...p with parts from the vane pump upgrade kit 1 Place the new O ring and guide pin in the int flange 2 Place the new side plate on the int flange 3 Side plate mounted correct 4 Place new stator ring on...

Страница 7: ...ace the rotor in the bearing 8 Position the 8 new vanes in the rotor The pins may be moved by using a screwdriver 9 Check that all vanes are positioned correctly 10 One vane is NOT positioned correctl...

Страница 8: ...ted upwards Fit the flange including side plate into both the bearing in the flange and in the stator 15 Make sure that the guide pin is located in the location hole 16 Change the new O ring in the HP...

Страница 9: ...positions 2 Fit the polymer coupling insert on the steel coupling Note correct position of the hole in the insert 3 Orient both the steel coupling and the 2 guide holes on the vane pump to fit into th...

Страница 10: ...e Disassembling and assembling iSave 21 vane pump with upgrade kit 180F4161 10 180R9402 521B1455 DKCFN PI 003 T1 02 10 2017 5 Exploded view vane pump Dimensions without tolerances acc To ISO 2768 1 de...

Страница 11: ...ide Disassembling and assembling iSave 21 vane pump with upgrade kit 180F4161 11 180R9402 521B1455 DKCFN PI 003 T1 02 10 2017 6 Exploded view iSave Dimensions without tolerances acc To ISO 2768 1 desi...

Страница 12: ...Danfoss A S High Pressure Pump Nordborgvej 81 DK 6430 Nordborg Denmark Danfoss DCS im 2017 10 180R9402 521B1455 DKCFN PI 003 T1 02 06 12...

Отзывы: