6.
Install the braided ground strap. See
Illustration 1.4
.
6a
Place the smaller hole of the braided
ground strap over the M4 thread-cutting
screw provided with the kit.
6b
Fasten the M4 thread-cutting screw (T10) in
the hole above the PROFIBUS module.
6c
Place the other end of the ground strap
over the right screw post on the bottom of
the connector plate. Secure with 1 M5 nut
(8 mm).
6d
Secure 1 M5 nut (8 mm) on the other screw
post of the sub D9 cover plate.
1
M5 nut on right screw post
2
Ground strap
3
M4 thread-cutting screw
Illustration 1.4 Ground Strap Installation
NOTICE
For easier connector installation, remove the PROFIBUS
module before attaching the Phoenix connector. Then
reinstall the PROFIBUS module.
7.
Plug the Phoenix connector into the PROFIBUS
module. See
Illustration 1.5
.
1
Phoenix connector
2
PROFIBUS module
Illustration 1.5 Phoenix Connector Installation
8.
When the sub D9 connector is not in use:
8a
Place the rubber cover over the connector.
See
Illustration 1.6
.
8b
Hand tighten the cover screws into the tops
of the jack screws.
1
Cover screws
2
Rubber cover
3
Jack screws
4
Connector plate
Illustration 1.6 Rubber Cover Installation
Installation Instructions
Top-entry Sub D9 Connector Kit for
Enclosure Sizes D and E with PROFIBUS Option
VLT
®
FC Series FC 102, FC 103, FC 202, and FC 302
MI38Q302
Danfoss A/S © 10/2017 All rights reserved.
5