background image

A-Series rigging components

2.5  Ring cotter
In connection with the A-Series rigging system, ring cotters are used

for the following items to prevent the respective item from

slackening and/or loosening:
▪ Fixing bolt of the shackles attached to the Flying frame.

▪ Fixing bolt of the cabinet's splay link.

▪ Fixing bolt of the Z5147 Rota clamp.

Function of the ring cotter
By default, the ring cotters are "locked" to prevent them from

loosening.
For modification reasons such as altering the position of the

Frame's Rear link or exchanging a shackle, it may be necessary to

temporarily remove the ring cotter and reattach it afterwards.
For this purpose proceed as follows:
1.

Unlock

Unlock the ring cotter by pushing up the front wire loop over

the straight wire shaft.

2.

Release and remove

Push down the rear wire loop until the ring cotter snaps over

the edge of the bolt and remove the ring cotter.

3.

Refit and lock

Refit the ring cotter by pushing the straight wire shaft through

the hole and pressing the front wire loop underneath the

straight wire shaft.

Ring cotter

Ring cotter locked

 

d&b Z5455/Z5459 Rigging manual 1.1 en

9

Содержание Z5459

Страница 1: ...Z Z5455 Z5459 Rigging manual 1 1 en...

Страница 2: ...e d b website for the latest version of this document When reselling this product hand over this document to the new owner If you supply d b products please draw the attention of your customers to thi...

Страница 3: ...pins 8 2 5 Ring cotter 9 2 6 Cabinet rigging mechanism 10 2 6 1 Front link mechanism 10 2 6 2 Splay link mechanism 10 2 6 3 Setting the splay angle s 11 3 Rigging Derigging 13 3 1 Preparing the setup...

Страница 4: ...Safety chain 1 4 t WLL 4 1 D2746 EN 01 Z5455 Rigging manual Weight incl all items 10 kg 22 lb Z5455 AL Flying frame dimensions in mm inch Qty d b Code Description 1 Z5459 d b ALi Mounting frame 1 Inc...

Страница 5: ...the array to be driven with ArrayProcessing For these special applications please consult with your d b sales partner 1 2 1 General safety Installation and setup should only be carried out by qualifi...

Страница 6: ...all vertical aiming of the entire array is defined by using a particular hole of the hole index on the center bar The corresponding hole position is calculated using the d b ArrayCalc simulation softw...

Страница 7: ...leg 6 mm Grade 10 Nominal length incl hook 534 mm 21 Load rating 1 4 t WLL 2 3 Secondary safety WARNING Potential risk of personal injury and or damage to material The secondary safety suspension mus...

Страница 8: ...ins are fully inserted and securely locked before lifting any load The A Series loudspeaker cabinets and rigging components are equipped with dedicated Locking pins Note The Locking pins are undetacha...

Страница 9: ...such as altering the position of the Frame s Rear link or exchanging a shackle it may be necessary to temporarily remove the ring cotter and reattach it afterwards For this purpose proceed as follows...

Страница 10: ...t the Front link 1 up to its stop position Once the Front link is fully extended it will be automatically fixed in place by the spring steel sheet 2 2 To slide the Front link back into its park positi...

Страница 11: ...in 5 increments The Splay link is constructed as a cylindrical extender we call it the Trombone The extension tube head can be turned counter clockwise by 90 and back again To change between the Stand...

Страница 12: ...A Series rigging components Overview chart Splay angle settings Shown with Z5455 AL Flying frame Same applies to the Z5459 ALi Mounting frame d b Z5455 Z5459 Rigging manual 1 1 en 12...

Страница 13: ...carry out a visual inspection of all system components for faults This also includes the loudspeakers and in particular the rigging parts of the cabinets Front and Splay Rear links Damaged components...

Страница 14: ...Suspend the assembly according to the desired suspension option 3 Prepare the next cabinet 1 Extend both Front links 2 At the rear release the Locking pin of the Splay link 3 Fold out the Splay link...

Страница 15: ...operating position recheck the entire assembly 3 3 Hoisting and securing the array When all the mechanical adjustments system checks and safety checks have been made the array can be hoisted up to its...

Страница 16: ...damage e g cracks or corrosion Visual inspection of the rear rigging strand for obvious damage e g cracks deformation or corrosion including all drilled holes of the component Inspection of all fitti...

Страница 17: ...ewith declare that said products are in conformity with the provisions of the respective EC directives including all applicable amendments A detailed declaration is available on request and can be ord...

Страница 18: ...D2746 EN 01 03 2021 d b audiotechnik GmbH Co KG www dbaudio com...

Отзывы: