4.) Slide the eave-purlin (10) over the eave-connector (1), (4) and (7) until the
drilling is covered, fit the M12x90 bolt and screw them together. In case the
eave-purlins (10) can not be slid on the corners, loose the connection at the
eave connection (7) to the beam and slide the eave-purlin (10) as well as the
beam (8).
10
10
10
7
7c
4
4
1
1
10
10
10
10
7
5
Содержание Pagoda Tent PRO+ 10x10m EventZone
Страница 1: ...15 05 2019 for Pagoda Tent PRO 10x10m EventZone Manual...
Страница 2: ...1...