9
3.1 Pre-assembly of posts, bars and braces
Assembly of posts and bars
Combine and match all components according to Fig. 4 (page 9) and 5
(page 11).
Lay out the components according to the images and following
description.
3.1.1
Push the left and right bar into the ridge shoe and connect with
pivot pins / screws.
3.1.2
Insert the posts with the corresponding rail connectors into the bars
and bolt with pivot pins.
3.1.3
Insert the trusses (completely mounted posts and bars) into the
base plate, bolt with foot bolts and secure with clip connectors.
(Important: It should be ensured that the holes in the foot bolts for the clip
connector are on the outer side of the marquee due to later assembly of
the foot tube.
3.1.4
Place and lay out pediment support / crossbeams at the respective
end trusses.
3.1.5
Sort and lay out flex holders (intermediate rails), ridge and eave
rails.