Dancover Marquee 10x15 m PRO+ EventZone Скачать руководство пользователя страница 23

2

3

 

5.3 Pediments 

The  plans  for  the  marquee  pediment  consist  of  2  pediment  covers,  an 

eyelet  and  a  loop  side.  The  inner  side  of  the  marquee  is  marked  with 

visible suture of the loops and the overlaps of the side, which forms the 

right  angle,  is  covered  and  welded  inward.

5.3.1 

Insert the pediments with the piping into the upper piping channel of 

the pediment bar  and  pull  to  the  centre of the  pediment  with assembly 

fork (image 12, page 22) 

5.3.2 

Tie both the pediment covers from top to bottom to the inner side of 

the  marquee  as  described  in  point  5.2.6  and  knot  last  loop  (image  12, 

page 22). 

5.3.3 

Place the buckle straps or loop fastener in the lower edge around 

the crossbeam / curtain pipe and close. 

5.3.4 

Repeat points 5.3.1 to 5.3.2 on the opposite pediment side. 

5.4 (If required) Assembling the foot tubes 

The  foot  tubes  for  the  side  and  pediment  covers  are  available  as 

accessory  for  each

 

marquee  and  installation  is recommended. 

5.4.1 

The  foot  tubes  are  inserted  through  the  foot  tube  of  the  side 

curtains (Image 13, page 24). 

5.4.2 

Push the foot tube on the pin of the marquee post and secure with 

splint pin. 

5.4.3 

Insert the foot tube on the pediment side into the foot tube pocket of 

the pediment curtains. 

5.4.4 

Likewise, place the foot tube into the intake bolts of the foot plate 

at the corner and secure with splint pin. 

Содержание Marquee 10x15 m PRO+ EventZone

Страница 1: ...29 06 2016 Manual for Marquee 10x15 m PRO EventZone...

Страница 2: ...ng the marquee 015 4 1 Installation of the tie frame 015 018 4 3 Assembling the pediment support 017 5 Assembly of the covers 019 5 1 Roof covers 020 021 5 2 Side and pediment covers 022 023 5 3 Pedim...

Страница 3: ...ow accident prevention regulations Ensure that there is no cable pipes etc below the marquee On the structure of this assembly manual Drawings and sketches are used to explain individual steps for the...

Страница 4: ...clothing e g gloves to prevent injuries Use the supplied tools for assembly Please note The model approval test log contains requirements specifications conditions and operating instructions for mobil...

Страница 5: ...uee Additional Site tools and equipment 3 x towing rope snap hooks load capacity at least 250 kg 2 x ratchet or wrench 2 x ladder 1 x sledgehammer ground anchor impact tool 1 x tape measure 1 x pipe w...

Страница 6: ...ng the base plate Wrongly or inaccurately positioned base plates will make further assembly difficult Required assembly tools and materials 2 1 Aligning the base plates Note Keep the ground anchor pro...

Страница 7: ...diagonal line between points A and B then the right angle is guaranteed if not the line between the 1st and 2nd base plate should be pushed such that the required dimension is achieved 2 1 9 1 Readju...

Страница 8: ...8 3 Preassembly...

Страница 9: ...ith the corresponding rail connectors into the bars and bolt with pivot pins 3 1 3 Insert the trusses completely mounted posts and bars into the base plate bolt with foot bolts and secure with clip co...

Страница 10: ...10...

Страница 11: ...11...

Страница 12: ...uld not be exceeded Arrangements of brace fields see Fig 6 Fundamental information on assembly The ropes of the braces should be mounted such that the turnbuckles are always placed at the lower end of...

Страница 13: ...13...

Страница 14: ...de with straight hook to the second truss with the help of assembly rod Image 8 page 16 4 1 6 Mount the ridge rail to the first truss with curved hook 4 1 7 Mount the ridge rail to the second truss wi...

Страница 15: ...15...

Страница 16: ...ce the pediment support vertically below the ridge shoe bar of the corresponding end bar and insert into the intake at the ridge shoes and screw Image 5 page 11 4 3 2 Insert pediment support into the...

Страница 17: ...17...

Страница 18: ...eded 5 1 4 Suspend both the pulling ropes into the two outer eyelets of the roof cover using snap hooks opening facing upwards Pull back the 3rd Mount pulling rope into the drawbar eyelet as pulling r...

Страница 19: ...19 5 1 9 Once all the roof covers are fixed in the bars these will be tensioned with corresponding tensionless belt pressure fix expander etc...

Страница 20: ...20...

Страница 21: ...way down 5 2 4 Assemble the 2nd cover eyelet and loop side in the same way point 5 2 2 and 5 2 3 5 2 5 For curtain rods push through the rings of the side covers and mount in the area of posts into th...

Страница 22: ...22...

Страница 23: ...last loop image 12 page 22 5 3 3 Place the buckle straps or loop fastener in the lower edge around the crossbeam curtain pipe and close 5 3 4 Repeat points 5 3 1 to 5 3 2 on the opposite pediment side...

Страница 24: ...24...

Страница 25: ...after the disassembly 6 1 Disassemble foot tubes if available 6 2 Place side and pediment awning on a clean surface and fold 6 3 Remove pediment cover as described in 6 2 6 4 Disassemble roof cover cl...

Страница 26: ...amages 7 1 4 If required damaged parts should be replaced immediately with original parts 7 2 Transport and storage In order to prevent deformities and damages to the aluminium profile all the compone...

Страница 27: ...30 m Roof incline 20 Truss distance 3 00 m Profile Posts 81 x 48 mm 94 x 48 mm Bar 81 x 48 mm 94 x 48 mm Ridge rail 40 x 35 mm Intermediate rail flex holder 40 x 35 mm eave purlin 60 x 55 mm Material...

Страница 28: ...s are made of material with low flammability in accordance with DIN 4102 B1 8 3 DIN ISO standards Marquees are based on the following regulations EN 1090 1 DIN EN 13782 DIN EN 1990 DIN EN 1991 DIN EN...

Страница 29: ......

Отзывы: