M4.2X16
Z01
PART NO
QTY
16
L12A
2
L01B
L12A
1
2
2
2
L12
2
L12A
Z01
23
L02A
L12A
L01B
1
L12A
L01B
1
2
1
M6
M01
4
1. Make a pencil mark on the end roof glazing bars (L01B) at a height of 766mm from the bottom.
2. Bolt 2 x L12A at each end to 4 x L01B using the extra S01 bolts placed in the bolt channels
earlier. Please note, if extra bolts were not placed in the bolt channel earlier L01B must be
unbolted at one end and moved enough to squeeze the bolts in.
3. Fix L12A to the roof glazing bars (L02B, L02C and L02D) with the self-tapping screws (Z01)
using a powered screwdriver. The inside of the glazing bars feature guide lines which indicate
the correct screw positions (see detail drawings below). Be careful to ensure that the screws
are in the correct position (see detail drawings below).
4. Ensure that L12A is fixed at a right angle (90 degrees) to the
glazing bars.
Screw position
Содержание GH152080
Страница 1: ...for Greenhouse 2 45x3 04x2 1m Manual 28 11 2019...
Страница 2: ...Assembly Instructions PRODUCT SIZE LxWxH 304X245X210CM PLEASE READ CAREFULLY BEFORE ASSEMBLY...
Страница 3: ...CONTENTS...
Страница 28: ...PART NO QTY 9 1 Y7 Y9 10 Y6 24 Y7 Y9 Y7 Y6 Y6 Y6 Y6 Y7 Y7 Y7 Y7 Y7 Y6 Y6 Y6 Y6 Y6 Y6 Y7 Y7 Panel Assembly...
Страница 31: ...L14 L14 27 L14 left door right door left door right door...