1
2
L02C
L02C&B
L02C&B
Z01
Z01
L02C
21
1
2
L02B
PART NO
QTY
1
L02B
4
M4.2X16
Z01
1
L02C
L06
L06
1
2
After the roof vents are in position, fix the last of the glazing bars (L02C) to the eaves
(L07) and the ridge (L06) with the self-tapping screws (Z01) using a powered screwdriver. The
inside of the glazing bars feature guide lines which indicate the correct screw positions (see
detail drawings below). Be careful to ensure that the screws are in the correct position (see
detail drawings below).
Содержание GH152080
Страница 1: ...for Greenhouse 2 45x3 04x2 1m Manual 28 11 2019...
Страница 2: ...Assembly Instructions PRODUCT SIZE LxWxH 304X245X210CM PLEASE READ CAREFULLY BEFORE ASSEMBLY...
Страница 3: ...CONTENTS...
Страница 28: ...PART NO QTY 9 1 Y7 Y9 10 Y6 24 Y7 Y9 Y7 Y6 Y6 Y6 Y6 Y7 Y7 Y7 Y7 Y7 Y6 Y6 Y6 Y6 Y6 Y6 Y7 Y7 Panel Assembly...
Страница 31: ...L14 L14 27 L14 left door right door left door right door...