散件 KIT
2
1
★
装配提示符号
Assenbly symbol guide
A:机身
B1-3:机翼
C1-2:垂直尾翼 C3-5:尾撬
D1-2:水平尾翼
E1-3:水箱像真件 F1-2:马达/引擎座
I:舵机安装盒
H:机翼连接杆
G:橡皮筋
G: Rubber band
J:拉线
K:起落架
L:机身隔板
M1-2:像真件
N:机轮
P:螺丝/舵角/零件包
Q:起落架支杆
R:桨罩
O:机翼支架
配件图仅做参考用,您收到的实物可能因为修改/优化的原因导致与图片有略有不同。
Photos shown here just for reference, the product you received maybe slightly
differ from the photos due to continuous improvement on products.
A
B1
B2
B3
C1
C2
C3
C4
C5
D1
D2
E1
E2
E3
F1
F2
G
H
I
J
K
L
M1
N
O
P
Q
M2
R
Ensure free rot
ation
Use medium CA
Use a pencil
确保自由转动
使用适量快干胶粘固
用铅笔做记号
Use thin CA
使用少量快干胶粘固
用力推入
Push tightly
Use hobby knife with
用模型刀切割
OIL
Apply Oil
加润滑油
Fully Tighten
拧紧安装
Apply threadlock
涂抹螺丝胶
Assemble right and left
左右对称安装
Repeat multiple times
重复拼装
x2
01
起落架安装
Assemble the Landing Gear
K
Q(粗 Thick)
K
1
2
3
把起落架K插入机身,同时穿入支架Q。安装时按图示1.2.3步骤,先装一侧起
落架,再穿入支架,然后装另一侧。
Insert the landing gear K into the fuselage, and then insert the bracket
Q. When installing, follow the steps shown in figure 1.2.3, firstly install
one side landing gear, then insert the bracket, and finally install the
other side.
在起落架支架上穿入轴套,并用橡皮筋绑扎两个支架,橡皮筋绑扎在起落架突
起的角上。
Insert the shaft sleeve on the landing gear bracket and bind the two
brackets with rubber bands. The rubber bands are tied to the corners
of the landing gear protrusions.
用自攻螺丝固定轮罩在轮子上。
Fix the wheel cover on the wheel with self-tapping screws.
把轮子装到起落架上,用螺帽锁紧。
Install the wheels on the landing gear
and tighten with nuts.
在图示位置插入较细的支架Q,并把两个支架左右端用自锁螺母锁定。
Insert the thinner bracket Q in the position shown in the figure, and
lock the left and right ends of the two brackets with self-locking nuts.
在起落架4个插入孔处,
用快干胶粘固。
Fasten with
quick-drying glue at
the four insertion holes
of the landing gear.
x4
01-1
01-2
01-3
Q(细 Thin)
轴套
shaft sleeve
G
01-4
01-5
01-6
M5 自锁螺母
M5 self-locking nut
M3 自锁螺母
M3 self-locking nut
M1.6*8mm 自攻螺丝
M1.6*8mm Self-tapping screw
O:Wing bracket
R:Spinner
Q:Landing gear bracket
P:Scr
ews/Rudder ho
rn/Acc.pack
N:Wheel
M1-2:Scale
parts
L:Fuselage partition
K:Landing gear
J:pull wire
I:Servo box
H:Wing linkage rod
F1-2:Mo
t
or/Engine mount
E1-3:
Water tank parts
D1-2:Horizontal tail
C3-5:Skid
C1-2:V
ertical tail
B1-3:Wing
A: Fuselage
橡皮筋
Rubber band