background image

 

 

ENG-Monteringsvejledning skinne/LVT/21.08.2013 

 

INSTALLATION INSTRUCTIONS

 

DAN DRYER

®

 HEIGHT ADJUSTMENT GLIDE

 

 

1. PREPARATION OF HAIR DRYER: 

 

  Disconnect power supply to the installation cable to which the hair dryer is to 

be connected. We recommend to apply a three-core cable with earth lead. 
Max. cable thickness: Ø8.3 mm; cross section per lead min. 1.5 mm

2

.   

 

Please take note that each glide with dryer must have its own double pole 
circuit breaker. 

 

  Disassemble dryer housing using the special Allen key supplied. 

 

  Remove the polystyrene protection block placed between the base plate 

and the motor housing. 

 

2. MOUNTING GLIDE ONTO WALL: 

 

 

  Select a suitable place to mount the height adjustment glide. The glide must 

be mounted plumb and level onto an even and solid wall.  

 

Installation onto plasterboard or equivalently soft wall is not recommended. 
If only such soft wall type is available, we recommend to install glide onto a 
reinforcement plate and to apply expansion bolts.  

 

Prepare to connect to power supply through the rubber bushing at the top of 
the upper wall bracket. 

 

Recommended installation height from the floor to the bottom edge of the 
lower mounting bracket is 130 cm for women and 140 cm for men. 

 

  Disassemble lower and upper wall brackets (pos. no. 8+11 in the enclosed 

components chart) using an Allen key to loosen the 2 x 2 machine screws 
(pos. no. 7). 

 

Disconnect the female part of the black connector on the upper wall bracket 
(pos. no. 8) from the male part; the latter being fixed to the wall bracket, and 
the former being connected to the grey spiral cable (power supply cable). 

 

  Attach the enclosed template to the wall with tape. Ensure that the template 

is plumb and level – and observe the recommended installation height.  

 

  Mark 2 x 4 holes through the template and double-check that the distance 

between these markings is correct. Drill 2 x 4 holes using a drill bit suitable 
for min. Ø8 mm dowels and screws suitable for the wall type in question.  

 

  Remove template and attach upper and lower wall brackets to the wall.  

 

  Feed the installation cable through the rubber bushing at the top of the 

upper wall bracket. Prescribed length of leads from cable coating is  
28 mm, of which 7 mm must be stripped for assembly in connector.  

 

Disassemble the lid of the male part of the black connector and connect 
leads as indicated. Reassemble lid, ensuring to relieve cable strain on the 
actual cable jacket – not on the leads. 

 

  Connect the female part of the black connector to the male part and fix the 

height adjustment glide onto the upper wall bracket using 2 of the 4 machine 
screws. 

 

Fix glide onto the lower wall bracket using the last 2 machine screws. 

 

  Feed the grey power supply cable (spiral cable), pre-mounted onto the dryer 

mounting bracket, through the cable entry in the dryer base plate. 

 

❾  

 

 

 

Attach the dryer base plate onto the dryer mounting bracket. Apply the 2 
enclosed M6 x 35

 

mm screws and 2 washers for the top screw holes – and 

the 2 M6 x 40 mm screws and 2 washers for the bottom screw holes. 

 

❿  

 

 

 

Connect the grey power supply cable to the dryer terminal block.  

 

⓫ 

Place the glide handle onto the two bottom screw ends at the back of the 
dryer mounting bracket. Fix tight using the last 2 washers and 2 M6 lock 
nuts enclosed. 

 

⓬ 

Remount dryer housing, reconnect power supply and test run dryer. 

 
 
 
 

 

IMPORTANT

 

 

•  

Annual, internal cleaning of the hair dryer is recommended.  

•  

Do not disassemble the magnet attached to the inside of the push 
button on the AA hair dryer – not even to test run dryer.

 

 
 

 

DATA, AA/AE HAIR DRYER: 

230 Volt 

50 Hz 

2360 W 

62 dBA 

 

Отзывы: