5
INSTALLATION
• Make sure the main breaker is turned off. Installation must be carried out by a
qualified person in accordance with standards applicable in the country where
the equipment is to be installed.
• Place template against the wall at desired height (see mounting height recommendations)
and mark location of (4) mounting holes and the wire service entry.
4. Insert the power cord
through the hole in the bottom.
Fasten with the retaining clip.
NOTE
Colours of live and neutral wires depend
on voltage of supply service.
5. Connect supply wires to terminal block:
Connections:
A.
Connect live wire (coloured red, brown, or white) to
the terminal block marked ”L”
B.
Connect neutral wire (coloured black or blue) to
terminal block marked ”N”
C.
Connect the ground wire (coloured green or green
and yellow) to the screw marked ” ”
1. Remove the (2)
cover-mounting screws and
the cover.
3. Fix the base plate of the hand
dryer to the wall with the screws
supplied with the unit.
2. Place the template on the wall
at the desired location. Drill (4)
holes as indicated.