A
B
D
C
V
661265
661289
661296
DN
100
125
150
A
490
503
590
B
378
378
425
D
240
240
274
V
31
31
23
C
220 - 330
220 - 330
261 - 349
2a.
1.
2.
2b.
Made in Germany
Do not reach into the pipe ends during installation and service work!
Crushing hazard!
Note:
The installation location for the Stausafe RS must be selected so that all drain points at risk of backwater are protected.
Observe a rest period of at least 1 m before and after the backwater closure. It must hereby be ensured that the facilities will
not be used in the event of backwater. No rain water may be routed through the backwater closure. The functional parts that
are provided on the integrated backwater closure for service work must be accessible and it must be possible to run the
functional check according to DIN 1986-3.
The anti-flooding valve is absolutely
1. in flow direction of the waste water
2. the Stausafe must be level in both axes.
Installation
Test
- 3 -