7
IPS 10 000 – Firmware Versions 10.7.X| REV. 1.0.0 | © 2021 Dallmeier
Safety Instructions
Only use the units described in this document if they are technically in proper working condition and for
the intended purpose while keeping safety and potential dangers in mind.
Qualified personnel
The installation, mounting, connection, commissioning and configuration of the units may only be car-
ried out by qualified personnel.
This also applies to the maintenance, testing and repair, whereat the regulations of the DIN VDE 0701
series of standards (repair, modification and inspection of electrical appliances) must be followed.
regulations
The use of video and audio surveillance systems is, in general, strictly regulated.
Inform yourself about the currently valid laws and regulations regarding data, worker and environmental
protection before using the units and ensure compliance with them.
System Components
Only use internal components that have been tested and approved by Dallmeier.
Inappropriate internal components may cause malfunctions, damages and data loss and may result in
the loss of warranty.
Modifications
Do not make any modifications to the hardware or software that have not been tested and approved by
Dallmeier.
Inappropriate modifications may cause malfunctions, damages and data loss and may result in the loss
of warranty.
Documentation
The product documentation contains several documents which are included in the scope of delivery in a
printed form and/or on a digital medium.
Read the documents included in the delivery carefully and thoroughly.
Always follow the contained instructions, notes and warnings and observe the technical specifications in
the product data sheet.
Keep all documents in legible condition and in a suitable location for future reference.
Regularly check the website www.dallmeier.com for the latest updates on product documentation.
Condensation Water
If the units are brought from a cold to a warm environment, resulting condensation water may cause
malfunctions and damages.
In this case, wait (up to 8 hours) until the units have reached room temperature before commissioning.