Rev. 1.0.0 | © 2019 Dallmeier | www.dallmeier.com
29
Commissioning MDF5450HD-DN
A-❾
➡
Observe the chapter “Interfaces” on page 38.
➡
Connect the required cables and finally establish the power supply (via PoE or by an external power supply unit).
The device starts up and is ready for operation after a few minutes.
Содержание MDF5450HD-DN
Страница 1: ...007810 Rev 1 0 0 2019 10 30 English MDF5450HD DN Commissioning ...
Страница 38: ...38 Rev 1 0 0 2019 Dallmeier www dallmeier com MDF5450HD DN Commissioning 9 Interfaces ⓐ ⓑ ⓒ ⓓ ⓔ ⓕ ...
Страница 51: ......
Страница 54: ......
Страница 55: ......