38
COMMISSIONING – DDZ5200HD Indoor Series IM | REV. 1.0.0 | © 2021 Dallmeier
Fig. 17
⓫
➡
Make sure that the cables to be connected are voltage-free.
➡
Connect the required cables to the connectors on the housing (see
chapter “Connections and Pin Assignment” on page 40).
➡
Establish the power supply to the device (via PoE+ or external 24 V AC
power supply unit).
The device starts to boot and is ready for operation after a short self-test.
Содержание DDZ5200HD Series
Страница 1: ...008267 REV 1 0 0 2021 02 02 COMMISSIONING DDZ5200HD Indoor Series In Ceiling Mount IM...
Страница 19: ......
Страница 25: ...25 COMMISSIONING DDZ5200HD Indoor Series IM REV 1 0 0 2021 Dallmeier Fig 4...
Страница 32: ...32 COMMISSIONING DDZ5200HD Indoor Series IM REV 1 0 0 2021 Dallmeier Fig 11 1 2...
Страница 37: ...37 COMMISSIONING DDZ5200HD Indoor Series IM REV 1 0 0 2021 Dallmeier Fig 16 Cover ring locked in place...
Страница 51: ......