16
4
INFORMA
TION ON USE
AND OPERA
TION
Carry out the operations described.
1)
Check that the water supply to the
machine is on.
2)
Press the main switch (
A
) to turn the machine on.
- The signal light (
B
) comes on.
- When the light is flashing, it means the machine is
warming up.
- When the light is on permanently, it means the pre-set
temperature has been reached.
- The display turns on.
- The main page appears on the display (see “Home
page of the operating terminal”).
Turning off the machine
At the end of the working day, the machine can be switched
off either fully or partially (i.e. only the boiler or only the
grouphead).
Before switching off the machine, run the cleaning pro
-
gram described in this handbook.
To turn off the machine completely, proceed as follows.
Turning on the machine
WARNING
Upon using the machine for the first
time and if the machine has been
left unused for some time, to pre-
vent impurities in the drinks, clean
the boiler and flush out the group
-
head for a good length of time (see
“Cleaning and initial start-up after
prolonged disuse”).
Содержание STUDIO AQUA
Страница 2: ......
Страница 51: ...49 49 49 ENCLOSURES A Wiring diagram 100 120 V 50 60 Hz...
Страница 52: ...50 50 50 50 ENCLOSURES A Wiring diagram 200 240 V 50 60 Hz...
Страница 55: ...53 53 53 NOTES...
Страница 56: ...54 54 54 NOTES...
Страница 57: ......
Страница 58: ...Code n Z 0017 EN Edition 12 2022...