NOTES
When installing a SUB S-100 in a plasterboard/dry wall
we recommend that two layers of plasterboard are used
in the area around the subwoofer. If it is not possible to
use two layers of plasterboard, we recommend one of
these measures:
• Reinforce the single layer plasterboard beneath the
dogleg clamps using wood pieces measuring at least 75
mm x 30 mm x 3 mm thick (3 in x 1.2 in x 0.125 in). Or…
• Install the SUB S-100 on-wall using a PHANTOM OW
frame S-80.
If an IW SUB S-100 subwoofer is to be uninstalled,
loosen the clamp screws by approximately 5 to 20 turns
counter-clockwise to loosen the dogleg clamps. Do not
unscrew more than 20 to 25 turns or the clamp arms
may disengage from their screws.
The SUB S-100 subwoofer incorporates eight dogleg clamps for In-
wall installation. The clamps secure the subwoofer firmly to the rear of
the wall surface on which it is mounted. The dogleg clamps extend out
at a 90 degree angle when the screws are initially tightened, and then
compress inwards to provide secure attachment to the wall.
The following tools and items are required to complete a SUB S-100 in-
wall installation:
Saw or knife
Hand cross-head screwdriver (or torque limiting power drill with cross
head bit)
Masking Tape
Cut-out template
Once the position and suitability of the subwoofer installation location has
been established, the cut-out template can be used to mark where the
wall aperture should be created. It is good practice to tape the cut-out
template at the installation position to ease creation of an accurate cut
line. Proceed then as follows:
4.2.3 In-wall Installation
11