4
EN
Check the device for damage during transport. If any part is lost or damaged, please immediately inform the carrier or
our company.
The length of the firmly installed duct from the fan should be at least 1 m. A shorter pipe should be equipped with a rigid
cover/grill that complies with EN ISO 13857:2008.
MOUNTING
AIR DUCK
AIR DUCK
Before mounting
•
The product should be installed by a qualified person.
•
The fan and auxiliary control equipment should be isolated from the power supply during installation and/or
maintenance. The equipment should be grounded.
•
Do not carry the product by taking the fan only by the terminal box or electric cables. The device should only be taken
by the housing. In this case, do not press on the fan grill.
•
During installation, use gloves to protect against sharp edges of the product and equipment.
Connection to the mains
Make sure that the mains parameters (frequency, power, and current) correspond to the parameters necessary for the
product.
1.
Before connecting to the mains, disconnect the power source.
2.
Remove the cover from the distribution block.
3.
Carefully study the wiring diagram (PIC 2 a PIC 3).
4.
Make the necessary connections and make sure grounding is present.
5.
After completing the connecting work and checking the connections to the junction box, move the cover, and make
sure it is fastened.
Connect the three-phase electric engine with a 4-core cable for inclusion in a 3-phase 380V/50Hz network. Connect
the grounding wire to the electric engine grounding screw.
ENGINE
ENGINE
white
red
blue
yellow / green
PIC 2 - 1 phase connection
PIC 3 - 3 phase connection
brown
black
gray
yellow / green
FAN
ENGINE
Содержание SKT HEAVY
Страница 1: ...SKT PROFI SKT HEAVY ...