
Mechanical Installation
9
Traffic Cabinet Mounting
Ground Mounting
Secure the traffic cabinet to a concrete pad using anchor bolts. Daktronics recommends
using
3
/
4
" stainless steel anchor bolts. When anchoring the traffic cabinet to the concrete
pad, make sure the bottom of the cabinet allows for water drainage. Do not seal the
cabinet to the concrete pad as this prevents water from draining properly.
The conduit for power and signal enter through the open area in the bottom of the
cabinet.
Pole Mounting
Mount the cabinet using the pole-mount brackets. Make sure the brackets are secured
at all locations.
LIE Mounting
LIEs are designed for pole-mounting. After installing the LIE, select power and signal
entrances on the bottom, sides, or rear of the LIE. Prior to drilling, be aware of internal
component locations to avoid damaging the components. Ensure the entrances will not
obstruct the drain holes on the bottom of the LIE.
Seal any hole punched or drilled in the LIE with either a watertight plug or with a
watertight conduit hub to prevent water from entering the LIE.