
14
Mechanical Installation
If the scoreboard is to be suspended from a hoist:
1.
Attach the cable sling to the four lift tubes on the corner braces of the frame.
2.
Lower the hoist cables and attach them to the master links.
3.
Raise the scoreboard 1-2' (305-610 mm) from the floor, and level the scoreboard by
adjusting the turnbuckles built into the slings.
4.
The hoist installer must set upper and lower primary limits and all safety limits.
Daktronics recommends maintaining a minimum of 2' (610 mm) between the
scoreboard and the nearest obstruction.
WARNING! Never raise or lower the scoreboard with personnel or equipment underneath!
Содержание Tuff Sport BB-2102
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 26: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 56: ...PERIOD B B daktronics DAKTRONICS GUEST HOME ...
Страница 60: ......
Страница 62: ...PERIOD GUEST HOME HOME PERIOD GUEST B B B B B B ...
Страница 64: ...HOME GUEST PERIOD HOME GUEST PERIOD B B B B B B B B ...
Страница 70: ......
Страница 71: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......
Страница 98: ......
Страница 99: ......
Страница 100: ......
Страница 101: ......
Страница 102: ......
Страница 104: ......
Страница 108: ......
Страница 109: ...Daktronics Warranty and Limitation of Liability 53 Appendix G Daktronics Warranty and Limitation of Liability ...
Страница 110: ......