Do not exceed maximum recommended air pressure
marked on the tool.
Verify prior to using the tool that the air
source has been adjusted within the rated air-pressure
rang. Be sure the air pressure gauge is operating properly
and check it at least twice a day. Tools operated in excess
of their maximum pressure rating may operate abnormally
or burst resulting in personal injury.
To connect the tool to the compressor only use pneumatic
air hoses that meet the following criteria:
Minimum hose pressure rating, 200PSI.
Minimum hose inner diameter, 1/4 in.
Maximum hose length, 100 ft.
Connect the air supply:
Snap the air hose onto the quick connector.
Check for air leakage. If leakage is noted, cease using the
tool immediately and performed by qualified repair
personnel.
Be sure the air pressure gauge is operating properly and
check it at least twice a day.
5
1.
2.
3.
WARNING
NAIL LOADING
Connecting the air supply before loading nails reduces the
risk of unintentionally driving a nail and injuring yourself or
someone else.
WARNING
FIG. 4
FIG. 6
FIG. 7
Connect air supply.
Place full clip of desired fasteners into the magazine. Up
to 100 cleat nails can be loaded into the magazine.
Pull the pusher back to the end of the cleat nails.
1.
2.
3.
LOADING CLEAT NAILS
L cleat
Pusher
FIG. 5
Pusher
T cleat
Pusher
CHANGING THE FOOT PLATE
Disconnect the tool from the air source whenever changing
the foot plate. Make sure there is no fastener in magazine
before changing the foot plate.
WARNING
Disconnect tool from air supply.
Empty the magazine completely.
Fire the tool into a piece of scrap wood to ensure there is
no compressed air fasteners left in the tool.
Set the tool on its side to expose the four screws.
Remove the four screws, then, remove the foot plate.
Align the four screw holes in the replacement foot plate
with the four threaded mounting holes.
Using the four screws you removed just now, secure the
replacement foot plate to the tool.
Ensure the correct foot plate is installed by firing into a
scrap piece of flooring and checking for proper fastener
placement.
1.
2.
3.
4.
5.
6.
7.
8.