INSTRUCTIONS

1.  Prepare dig zone by removing 

pavers if being installed into   

pre paved area.

3.  If space is restricted on one side, place box at least 

100mm past the pool edge or as far as possible if pool 

wall is on a boundary. Please ask us for advice on 

placement in restricted space circumstances. 

2.  Dig trench to minimum of 

550mm wide and 555mm deep 

(BGB) or 400mm wide and 

410mm deep (BGB Small) and 

at least 300mm past either side 

of the pool’s waterline edge. For 

example, if pool is 4000mm wide 

dig trench 4600mm long.

4.  Once trench is dug to correct 

size and depth, place concrete 

slabs at each end where angle 

braces are located on the box 

(approx. 1000mm – 1200mm 

from end of box).

9.  Once box is level, measure 

the distance away from pool 

headers so they are the same 

either side (within a couple of 

millimetres). 

5.  Level these slabs so they are approx. 512-515mm 

(BGB) or 356-360mm (BGB Small) below the finished 

height of paving or concrete. Place spirit level on pool 

headers and lay across the trench propping the other 

end up so spirit level is level. Using the level, measure 

down to the slabs to obtain correct depth of slab. Use 

rubber mallet to tap down to bed slab in. 

7.  Once blue metal is down you 

are ready to place box into hole. 

Carry box to the trench edge, 

place rope or straps under each 

end of box and use these to lift 

and lower into hole.

 

 

6.  Once both slabs are in place and at correct level, place 

for sufficient drainage, blue metal or aggregate along 

the trench making sure you do not exceed more than 

50mm above the slab height, for boxes with a centre 

brace or braces leave a small amount out so brace 

doesn’t touch the blue metal. 

8.  With box in the hole and end 

braces are sitting on concrete 

slabs level box up to required 

height via the 4 bolts inside 

the box, screw all 4 down so 

they touch the concrete slabs 

and then every 1 turn gives you 

approx. 1mm of lift. Make sure 

cover does not touch bolt head.

Note: Ensure correct orientation – lid 

opens towards pool

NOTE: Take note of site and soil drainage requirements. Extra (sub soil) 

drainage may be required to take water away from the BGB. If there is 

not sufficient drainage the BGB will fill with water. 