Fuse replacement
If the fuse is blown, the engine will not start until it is replaced.
1) Turn the engine switch OFF
2) Remove the fuse holder and replace the fuse. Use only a 30A fuse.
If frequent fuse failure occurs, determine the cause and correct the
problem before attempting to operate the generator further.
Never use a fuse with a rating other than 30A. Serious damage to the
electrical system or a fire may result.
Battery
The generator
’s engine has a 3-amp charging system to charge the battery while the
engine is running. If the generator is only used periodically, the battery must be
charged monthly to maintain the battery service life.
A lead acid battery self discharges at a rate of 0.5
-
1.0% per day. This means that the
battery, if the generator is not operated in a month, can discharge as much as 30% in
the same period. This could cause the engine not to crank or shorten the service life of
the battery. To charge the battery, follow the procedures below.
Removal
1) Remove the battery set plate.
2) Remove the negative(-) cable from the battery negative(-) terminal, then remove
the battery po) terminal.
Battery set plate
30A fuse inside the
control panel
Negative (-)
cable
Positive (+)
cable
Содержание SGB12000HSa
Страница 6: ...5...
Страница 31: ...30 11 TROUBLE SHOOTING When the engine will not start...
Страница 32: ...31 No electricity at the A C RECEPTACLES...
Страница 34: ...33 13 WIRING DIAGRAM SGB12000HSa 220V 50Hz...
Страница 35: ...34 SGBT14000HSa 3P 380V 220V 50Hz...