background image

Tetra

®

 MAX

Installation Guide

3

Measure and cut Tetra LED 

strip to the appropriate length 

for each letter. Cuts can be 

made between any of the 

modules.

Use rivets, screws, or 

electrical grade RTV silicone 

to secure at least every 

fifth LED module within the 

channel letter. Use #6 (M3) 

pan headed metal screws, 

1/8-inch (3.2 mm) rivets, or 

electrical grade RTV silicone.

Drill a 1/4-inch (6.4 mm) 

hole near the LED strip and 

grommet the hole for supply 

wire access.

Remove all the debris from 

the inside of the channel 

letter and replace the sign 

face. 

NOTE: For halo-lit applications LED modules should be mounted on 

UL recognized clear acrylic or polycarbonate. The light output from 

the LED system should be directed back into the sign enclosure. This 

will allow for uniform backlighting of the sign and will provide simple 

mounting.

Before you begin, clean 

surfaces and remove all debris 

from the inside of the channel 

letter.Clean the surfaces with 

a 50:50 mixture of isopropyl 

alcohol (IPA) and water and let 

dry.

Layout Modules

Dimensions

Remove tape backing and 

stick LED modules into place. 

When using tape apply 

approximately 15 psi pressure 

on the module (avoid the lens 

dome surface) for 5 seconds, 

full bonding strength after 24 

hours. Continue until you have 

reached the end of the strip.

Do not 

press lens

   

   

[3.45]

87.60

[.45]

11.41

[.63]

16.10

2

5

1

4

3

6

Содержание GE Tetra MAX

Страница 1: ...rmacija nalazi se na sljedečoj lokaciji https products gecurrent com eu HU A telepítési útmutató és a biztnosági információk magyar nyelvű változata az alábbi címen található https products gecurrent com eu IT La versione italiana del manuale di installazione e sicurezza può essere reperita nella seguente sezione https products gecurrent com eu LT Lietuvišką diegimo instrukcijos ir saugos informac...

Страница 2: ...ité d entrée de l enseigne L installation de cet équipement de remplacement DEL peut impliquer le perçage ou le poinçonnage de trous dans la structure du panneau Vérifiez le câblage et les composants inclus pour éviter d endommager le câblage et les composants électriques Ne pas faire ou modifier les trous ouverts dans une enceinte de câblage ou de composants électriques pendant l installation de ...

Страница 3: ...s LED modules should be mounted on UL recognized clear acrylic or polycarbonate The light output from the LED system should be directed back into the sign enclosure This will allow for uniform backlighting of the sign and will provide simple mounting Before you begin clean surfaces and remove all debris from the inside of the channel letter Clean the surfaces with a 50 50 mixture of isopropyl alco...

Страница 4: ...E Refer to Maximum Loading Remote Mounting Specifications on page 5 Connect the red stripe wire of the LED strip to the red wire of the power supply Connect the white wire of the LED strip to the black or blue wire of the LED power supply NOTE All electrical connections should be suitably protected from mechanical damage and the environment Seal all connections in wet locations with electrical gra...

Страница 5: ...h circuit supplying the existing transformer or ballast will be within the voltage ratings of the new LED power supply and have a current rating not exceeding 20A or that permitted by applicable local state or country electrical codes whichever is less 2 Existing Signs Only Remove the existing lighting equipment to be replaced such as neon tubing or fluorescent tubes and associated transformers an...

Страница 6: ... m 210 modules 140 ft 42 67 m GEPS24 180U Load shall not exceed 3 8A per each of 2 output channels 168 modules 112 ft 34 14 m per bank 336 modules 224 ft 68 27 m per PS 103 modules 68 7 ft 20 93 m per bank 206 modules 137 3 ft 41 86 m per PS 100 modules 66 7 ft 20 32 m per bank 200 modules 133 3 ft 40 64 m per PS 110 modules 73 3 ft 22 35 m per bank 220 modules 146 7 ft 44 7 m per PS 200 modules 1...

Отзывы: