3
|
Components
Service manual
221
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
BS1Q-A
a
a
Fuse
BS4~16Q-A
a
a
Fuse
Is the problem solved?
Action
Yes
No further actions required.
No
Return to
214] of the Branch
selector box PCB and continue with the
next procedure.
3.3 Compressor
3.3.1 Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
To perform an auditive check of the compressor
Prerequisite:
First perform a power transistor check of the inverter PCB, see
274]. If power transistor is OK, proceed as follows:
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
Содержание VRV IV+
Страница 473: ......
Страница 474: ......
Страница 475: ......
Страница 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...